110 likes | 307 Views
ELI-NP Team , March 5, 2013. Extreme Light Infrastructure . 2006 – ELI on ESFRI Roadmap ELI-PP 2007-2010 (FP7) ELI- Beamlines (Czech Republic) ELI- Attoseconds (Hungary) ELI-Nuclear Physics (Romania ) ELI-DC (Delivery Consortium): 2010, Legal entity: April 2013
E N D
Extreme Light Infrastructure 2006 – ELI on ESFRI Roadmap ELI-PP 2007-2010 (FP7) • ELI-Beamlines (Czech Republic) • ELI-Attoseconds(Hungary) • ELI-Nuclear Physics (Romania) • ELI-DC (Delivery Consortium): 2010, • Legal entity: April 2013 • Czech Republic, Hungary, Romania, • Italy, Germany 2
Bucharest-Magurele National Physics Institutes NUCLEAR Tandem accelerators Cyclotrons γ – Irradiator Advanced Detectors Biophysics Environmental Physics Radioisotopes BUCHAREST ring rail/road ELI-NP ELI-NP Lasers Plasma Optoelectronics Material Physics Theoretical Physics Particle Physics
ELI-Nuclear Physics Large equipments: • High power laser system, 2 x 10PW maximum power • Gamma beam, high intensity, tunable energy up to 20MeV, produced by Compton scattering of a laser beam on a 700 MeV electron beam produced by a warm LINAC Buildings:33000sqm total Experiments: • 8 experimental areas, Interaction chambers, Beam transportation • 8 auxiliary laboratories 4
ELI-NP Main buildings • Lasers • Gamma • Experiments • Laboratories
ELI-Nuclear Physics Large equipments: • High power laser system, 2 x 10PW maximum power Thales Optronique SA and SC Thales System Romania • Gamma beam, high intensity, up to 20MeV, produced by Compton scattering of a laser beam on a 700 MeV electron beam produced by a warm LINAC EUROGAMMAS (Italy, France, UK, Danemark, Sweden) Scientific program: • Nuclear Physics experiments to characterize laser – target int. • Photonuclear reactions • Exotic Nuclear Physics and astrophysics • Applied Research 6
Financial aspects Implementation by EU Structural Funds: • Project Approval: 18.09.2012, Contract with MA: 12.12. 2012 Building 66 M€ Staff 34 M€ Large Equipment 120 M€ Scientificequipment 49 M€ Others 24 M€ Total 293 M€ • EC contribution: 243 M€ • National contribution: 50 + 63 + 5 + 4 = 122 M€ • Duration/phasing: 2 phases (2012-2015/2014-2017) • 1st phase EC approval : 180 M€
Project implementation 2010 2011 2012 2013 2014 2015 White Book (Scientific Case) Feasibility Study Preparation of the Application E.C. Evaluation & Approval Building - Preparation Building - Construction Major Eqp. - Tender Major Eqp.– Constr, Install Experimental set-ups Recruitment 2017 8
Human Resources Technical Staff (18) Eng. Staff (18) PhD students (50) Jr. researchers (107) Senior researchers (20) Head of Res. Activities (5) 2013 2014 2015 2016 2017 2018 2019
June 14, 2013 August 23, 2013 February 2014 September 25, 2013
GOVERNMENT OF ROMANIA EUROPEAN UNION Structural Instruments 2007-2013 Infos: http://www.eli-np.ro Management Team Dir.: N.V. Zamfir Deputy : Gh. C-D Sci. Dir: Sydney Gales Technical Dir.: C. Ivan Financial: Al. Popescu Legal &HR: R. Stoicea March 2014