220 likes | 347 Views
Biography of JWST MIRI SMO FM. MIRI day. Design evolution. MIRI development. EQMm and EQMg. STM. QM. VM. MIRI VM tests. Improvements. Response folding flat Response M1-1 Integrate mounting points in structure Peripheral mounting No bolt heads in optics box Additional baffles
E N D
Biography ofJWST MIRI SMO FM MIRI day
Improvements • Response folding flat • Response M1-1 • Integrate mounting points in structure • Peripheral mounting • No bolt heads in optics box • Additional baffles • Closed covers