An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. July 11, 2006 / 3pPhase IV Projection Emission Inventories Fire Emissions Joint Forum July 11-12, 2006 Portland, OR Dave Randall, Air Sciences Inc.

  2. Phases of Fire EIs • Phase II (historical 2002) • Baseline (Phase III) (nominal 2000-2004) • Projections (Phase IV) (nominal 2018)Activity Scenarios for each fire type • Less • Likely • More Note: The PLANNING inventories (Phase III & IV) are unique EI’s…unique from each other AND unique from Phase II

  3. 2018 Projection Activity Scalars

  4. Anticipated 2018 Activity Levels(Acres)

  5. Air Quality Planning Fire EI Suites

  6. Rounding Deviation from Scalars and Activity Targets • Multiplying a baseline level times its scalar arrived at an activity target in acres. • By design, the Calc Tool pulls fire-days (with their complete acres and emissions) up to this activity target. • For every jurisdiction in the calc tool, the event-based projection EI will therefore deviate from the activity targets. • Can be thought of as a “rounding error.”

  7. Rounding Deviation Statistics • Assessed deviation by-state or by-agency or by-burn type for all fire types and scenarios. • Did not attempt to hit each Rx state-agency-burn type combination. • Average deviation of 2.6% for all 124 scalars needed for 2018 projections suites. • 10 projections were over 10%. These had fewer than 100,000 acres as the projection target so could be affected by a large fire in seed data.

  8. Detailed Results andCalc Tool Methods

  9. ERT APPLICATION RULES Implementation Regulatory Will of the Agencies - % of Controllable Acres to which ERT’s are applied Emission reductions due to ERTs Technical Implementation Controllable Portion of the EI Entire EI Rx Events FOR EACH EVENT TO WHICH ERT’s ARE APPLIED: ANTH Portion of Rx Events AGGRESSIVE ANTH Events Subject to ERT Rules ANTH Events to which ERT’s are applied (a fnc. of Freq of Use of the ERT in the sub-region EMISSIONS X (1-ERF) LIKELY ANTH Portion of Rx Events ANTH Events to which ERT’s are applied LEAST AGGRESSIVE ANTH Portion of Rx Events ANTH Events to which ERT’s are applied

  10. Basic Steps to Run theCalc Tool

  11. Calc Tool Prototype as Excel Workbook

  12. Load Seed Data (WRAP Baseline)

  13. 1- User enters scalars 2- Tool calculates number of new events/acres needed 3- Hit “Go” and events are “looked up” from randomized Source sheet into New Events sheet

  14. Post Processing • Apply ERTs after Calc Tool selection(Will be integrated into Calc Tool.) • ERT Seasonal Suites for lookup table being finished after yesterdays’ Strawman Session. • Combine output into single 250,000 record all-scenario database for graphing & QA. • Format into SMOKE and NIF files.

  15. Significant Features of 2018 Projection Calc Tool

  16. Significant Features –Software Architecture • Software design strategy of “seed data” versus programming code to create new EI • Customize historic data to have appropriate seed events for desired projection EI. • Leave Calc Tool code to only choose events up to activity targets, not modify events per se. • Benefit: User can alter event data to suite EI planning rather than reworking code. • Pre-processing seed data • Random sort of events so new EI doesn’t have undesirable patterns in events. (For instance an 0.5 scalar pulls events only from counties A – M because of original order.) • Hand remove or flag ineligible events: Certain large Rx fires were causing big rounding errors in jurisdictions with small targets. Flag a realistic size limit for WFU events in WF pool.

  17. Significant Features – Rx Stem Cell Events • Creating fire events for 2018 where none existed in historic data (aka “stem cell events”) • Scalars and IFC activity targets resulted in 2018 Rx activity projected for state-agency-burn type combinations which did not exist in 2002/baseline seed data. • For only those instances, prototype prescribed burns were created outside the calc tool and augmented into seed data. • 50 acre broadcast burns and 25 acre pile burns dropped on every 12-km grid cell per agency land where needed. • Fuel loading (at centroid), lat/lon, and random date assigned to event (piles: April or November; broadcast: April or October). • Benefit: Reasonable size and date with site-specific fuel loading satisfies this unexpected gap filling. Compatible with cloning.

  18. Significant Features –Event Management • Cloning events • Rx events are re-used to create more activity. • WF events are re-used to achieve WFU targets. • “Data inbreeding” mitigated by adjusting date +/- 7 days and assuming event occurs elsewhere in same model grid cell. • Benefit: Create additional realistic model-ready activity for 2018 while not simply scattering events or scaling up emissions in existing events. • Handling multi-day events and smoldering records • Random sort of seed events does preserve fire-day order and smolder record pairing. • Benefit: Entire events are pulled into new EI.

  19. Next Steps • Deliver formatted output files from Phase IV Calc Tools and group into modeling suites – files ready for posting . • Deliver Draft documentation for Phase III/IV Task Team Review – draft document should be posted within a week. • Incorporate comments and deliver Phase III/IV Final documentation.