1 / 25

Precision Performance and Maximized Drainage

Precision Performance and Maximized Drainage. CONCEPT. PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf and PDS 2x2 Tile Onto base Into drains. THE COMPLETE SYSTEM. FieldTurf. PDS Tile. Crushed Stone. Concrete.

zared
Download Presentation

Precision Performance and Maximized Drainage

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Precision Performance and Maximized Drainage

  2. CONCEPT • PDS tile installed on concrete base • FieldTurf installed over the tile • Water flows: • Through Turf and PDS 2x2 Tile • Onto base • Into drains

  3. THE COMPLETE SYSTEM FieldTurf PDS Tile Crushed Stone Concrete

  4. THE COMPLETE SYSTEM – In Action FieldTurf PDS Tile Crushed Stone Concrete

  5. Roof Top Anchoring – Special Case Wall FieldTurf Adhesive Angle Iron PDS Tile Crushed Stone Concrete

  6. MAJOR BENEFITS • Precision Performance • Maximized Drainage • Installation Friendly • Reduced Installation Time • Minimized Base Cost

  7. PRECISION PERFORMANCE • Surface Consistency • Uniform surface…anywhere • 64 squares conform to surface • No “bridging”

  8. PRECISION PERFORMANCE • Exceptional Load Bearing Capacity • Max load at yield is 164 psi • 4.3 times greater than competition • Design safety factor of 2.7 • Competitor is 0.62…not much safety • 1,088 legs and roman arches • Support and distribute stresses • Delivers long term performance

  9. PRECISION PERFORMANCE - FEA

  10. PRECISION PERFORMANCE • Thermal Expansion and Contraction • PDS Tile will install flat in “heat” • 224 thermal “u” joints per 2x2 tile • Bi-directional 0°-90° • “Slack” in “Smart Clip” • Bi-directional • Ensures easy assembly

  11. PRECISION PERFORMANCE • Tri-Axial Design • 0°/ 90°/±45° resists bending and twisting • Grid holes less than 9/16” wide • Eliminates “dip” causing gaps by 77% • Turf Grip • 18 Small “bumps” per small square • Edges of Tri-axial design • Infill acts as ballast • Turf stays in place. Sure footed.

  12. MAXIMIZED DRAINAGE • Maximized Volume Voids • Unequalled Vertical Permeability • Unparalleled Horizontal Transmissitivity • Outstanding Support

  13. MAXIMIZED DRAINAGE • Maximized Volume Voids • PDS tile has 84% volume voids • It’s more about what’s not there • Typical competitive product has 35% • PDS tile guarantees drainage

  14. MAXIMIZED DRAINAGE • Unequalled Vertical Permeability • PDS tile has 71% surface voids • Ensures water flow through turf/tile • PDS tile never holds back water

  15. MAXIMIZED DRAINAGE • Unparalleled Horizontal Transmissitivity • Optimized number of legs • Ensures horizontal flow • Optimized leg ht • Maximizes below tile volume • Lab tested (ASTM) • PDS tile drains 153 times better than competitive product • All this…in a low profile ½” design 0.172 0.328

  16. MAXIMIZED DRAINAGE • Outstanding Support • 1,088 legs • 1.93 legs/si • 19% leg area/si • No load concentration • Better than a bed of nails! • Leg Beveling • Smooth “edges” Added radii to bottom of legs

  17. INSTALLATION FRIENDLY • Lightweight design • 1.468 lbs for 3.92 sf of tile • Easy to handle, speeds up install • Easy to cut • 8 “Smart Clips” • Provide firm positive lock • Beveled “teeth” in clip • Allows for easy tile removal • Small rotation in Smart Clips • Installer can roll up the tile • Temporarily place it aside if required 8 Smart Clips

  18. PDS TILE – Transition Joint Face this way Align with Centre Install PDS Joint FTTK Logo Bottom Left FTTK Logo Bottom Left Face this way PDS Joint (Green)

  19. REDUCED INSTALLATION TIME • Installed in 50% less time • Increased installation capacity • Use PDS…make $$ Liner Crushed Stone Natural Soil or Fill

  20. MINIMIZED BASE COST • Save significantly on base cost • Depending on location • Use PDS…save $$ !!! Liner Crushed Stone Natural Soil or Fill

  21. PDS TILE - TECHNICAL SUMMARY

  22. PDS TILE MANUFACTURING • Currently • Less than 4 days • = 80,000 sf • By Nov 2007 • Less than 2 days • High Capacity

  23. PDS Installations: 2” Stone, Liner • Approx. 500,000 sf installed • 5 fields in total • PDS is validated • Over 1 MM sf by 2008 Q1 • Varied climates • Hot, Cold, Wet

  24. PDS Installations: Concrete or Asphalt

  25. Precision Performance and Maximized Drainage

More Related