Siting, Real Estate and Interconnection Issues for Wind Projects. Tim Conboy IPED Financing Windpower May 8, 2008. Outline. Introduction Development Process Siting Real Estate Interconnection Summary. Acciona Energy. Wind Long-term developer, owner & operator
E N D
Siting, Real Estate and Interconnection Issues for Wind Projects Tim Conboy IPED Financing Windpower May 8, 2008
Outline • Introduction • Development Process • Siting • Real Estate • Interconnection • Summary
Acciona Energy • Wind • Long-term developer, owner & operator • Manufacture AW-1500 1.5 MW wind turbine generator • #1 globally in project development (4,690 MW/175 projects) • Own/operate 3,465 MW of wind generation • Thermal & PV Solar – develop, own & operate projects • Small Hydro – own & operate in Spain • Biomass – 1st straw-fired plant in southern Europe • Biofuels – biodiesel and bioethanol production facilities
Development Process Preliminary Investigation Land Access Local Government Consultation Critical Issues Analysis Wind Resource Measurement Preliminary Design & Engineering Environmental Impact Studies Transmission Interconnection Permitting Power Marketing Final Design & Engineering Project Financing
Siting • Wind resource • Compatible land • Nearby transmission • No undue environmental impacts • Power market • Local government & community interest
Real Estate • Wind energy lease • Payment – calculation (gross revenues) • Landowners without turbines • Assignment – consents • Actual location of facilities • Hunting rights • Transmission interconnection • Obtaining adequate ROW • Use of existing ROW • Land control - as a solution • Setbacks, noise • Mitigation efforts (wetlands, avian)
Interconnection • Land Control • Competition • Curtailment • Equipment Selection • Interconnection Agreement
Summary • Development Process • Siting • Real Estate • Interconnection