An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Trying to get the shingling finished in a snowstorm

  2. Charron going up the valley

  3. Looks like Santa Claus

  4. Moving up the roof

  5. In floor heating pipes and sewage pump

  6. I use these photos for measurements needed when the floor is finished and I’m installing partitions

  7. The sunlight will help us clear snow from the plywood

  8. New garage door openings behind the sliding doors

  9. A promising sunrise

  10. Larry has come to pour the basement floor

  11. The concrete truck promptly gets stuck – two tractors to help get it in position to pour through window openings

  12. Concrete chute through a window opening

  13. Finished – pulled up onto the driveway

  14. Wash out the chute into the bucket for disposal

  15. Freshly poured concrete in the basement

  16. The other end of the basement

  17. Hammer and tong on the roof to get it finished

  18. Lots of straw helps with traction – little frost in the ground

  19. North side is finished

  20. East side of the link is finished – two roof vents

  21. Putting on the ridge cap

  22. Oscar inspects

  23. Typar on the east wall – joints taped

  24. Power trowel to give us a smooth finish

  25. The arrival of Prest Electric – local electrician

  26. Basement windows installed in the bedroom

  27. Installing windows in the basement living area

  28. Floor finisher leaves us some concrete from hand troweling

  29. Windows installed – east end of the basement

  30. “ Nosy Parker “ watches what we do

  31. Now the concrete has to dry thoroughly

  32. It will take some time before we can install partitions

  33. Propane heater helps the process

  34. In floor heating tubes can be hooked up to the water heater

  35. A row of basement windows

  36. East end of the basement – windows at grade

  37. My morning arrival

  38. Typar on the interior of the basement walls allows air to pass through but keeps moisture against the concrete and away from the insulation to be installed