1 / 16

Shoreline Community College

Shoreline Community College. All-Campus Meeting February 20, 2009. General Assumptions. Expected to meet current FTE targets Anticipate reduction between $2.45 and $3.25 million (10%-15% of 2008-9 base) Implement layoff / RIF @ $2.45M level

zariel
Download Presentation

Shoreline Community College

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Shoreline Community College All-Campus Meeting February 20, 2009

  2. General Assumptions • Expected to meet current FTE targets • Anticipate reduction between $2.45 and $3.25 million (10%-15% of 2008-9 base) • Implement layoff / RIF @ $2.45M level • President to speak with Classified and Faculty unions regarding the level at which communication will occur

  3. Status of Current-Year Budget Reductions • $1.27 million • $707,000 : Vacant positions, not filled • $197,000 : Position Savings and Transfers • $370,000 : Goods & Services / Travel / Hourly

  4. Status of Current-Year Budget Reductions • State of WA Budget Actions • First 2009 Supplemental Budget • SCC targeted reduction: $1.01 million • ESSB 5460: “Belt-tightening” bill • Hiring freeze • Personal services contracts freeze • Out-of-state Travel and Training freeze • Equipment purchase freeze • Exemptions through OFM via SBCTC

  5. Shoreline’s Budgeting Process • SBCTC established FY 2010 budget reduction target: 5%-20% • PSET-Budget Committee jointly established “Points of Consideration” document • SET identified potential reductions, submitted FY 2010 budget draft (Jan. 16, 2009) • Budget draft further modified and adjusted by PSET, emphasized 10%-15% range

  6. Shoreline’s Budgeting Process • Methods, Tools, and Consultations: • Points of Consideration document • Anonymous comments from staff, faculty and students collected from December 2008 – February 2009 • Discussions with Faculty and Classified unions • Communications with SBCTC • Joint meetings with Budget-Strategic Planning Committees • 2008 Student Body Survey

  7. Revenue for Fiscal Year 2008-2009

  8. Salaries and Wages: Historic Trends and Projected Impact of Budget Reductions

  9. Impact of Personnel Reductions

  10. Personnel Reductions @ 10% and 15% * @ 10%, 13 of 33 positions are currently vacant ** @ 15%, 16 of 42 positions are currently vacant

  11. Distribution of Personnel Reductions (%)

  12. Distribution of Reductions by Total Personnel (%) *Position numbers include all FT and/or permanent appointments, regardless of funding source

  13. Where do we go from here? • President continues discussions with Faculty and Classified unions • President to meet with affected personnel first week of March • March 6th All-Campus Meeting • Budget development process continues (Revenue, Other expenditures, etc.) • Prepare for continued impacts into and throughout next year

More Related