An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ElDeRly-friEndly Alarm handling and MonitorING Midterm Workshop Odense (DK), 15th of September 2010 Italian Site Trieste: A.S.S. n. 1 and Tesan-Televita Srl

  2. Italian Pilot Site in Trieste Region Friuli Venezia Giulia The Partners:

  3. Geographic location we are here Trieste: 214.000 Inhabitants 26% elderly - (21.000> 80) 3

  4. Trieste trial site -Consort flow chart 4

  5. Trieste trial site- Demographic Profile

  6. Living Situation Trieste trial site

  7. Trieste trial site-Pathological Profile

  8. Trieste trial site - Progress achieved 20 DREAMING users 2 Connection programmed 2 Users with ADSL problems 6 Cases dropped out 08/09/2010 Installations started: 28/09/2009

  9. Trieste trial site - Drop Out • 6 DROP OUT IN TRIAL GROUP: • 1 moved to another city (*) • 1 for personal reasons (*) • 1 refused the devices • 1 afraid of radiation from wireless equipment (*) • 1 permanently transferred to an elderly home (*) • 1 dead • 6 DROP OUT IN CONTROL GROUP: • 3 for personal reasons • 3 dead • (*) Before equipment installation

  10. Trieste trial site- Equipments

  11. Trieste Trial Site-Contact Centre • managing clinical folders • monitoring use of devices • videoconferencing • promoting social inclusion • managing type 1 and 2 alarms/h24 • activating network • earning the trust of users • maintaining stable contacts with users

  12. The web Portal

  13. Trieste trial site –Type of alarms From28/09/2009to08/09/2010 (11months):

  14. Trieste trial site – Type of alarms From 28/09/2009 to 08/09/2010 (11 months):

  15. Trieste trial site -Helpdesk Objectives • to provide a single contact point for technical queries • to provide answers for demands or problems of users and operators • to facilitate the restoration of normal operational service Functions • to receive calls • to identify problems • to record and to track complaints • to call the elderly users and keep them informed 19

  16. Triestetrial site -Status08/09/2010 • All the case managers get their personal account and use the HIS portal (training session ad hoc) • 30+30 baseline questionnaires completed (SF-36 for QOL and HADS for depression) • Every participant (trial + control group) received the “personal diary” and was instructed to fill in them • Collection of “secondary outcomes” for the first period of the trial (for both group) completed • Monthly meetings in order to coordinate the professionals, increase the motivation to follow-up the trial protocol and the patients • Nurses are the key-operators of the projec