Material cost variances

Material cost variances. Problem Q.paper April-2007 : In a firm budgeted- actual figure of the cost of Materials &direct labour cost incurred in the production during the month of march2007 are as under. You are required to calculate M.C.V, MPV&MUV SOLUTION :

zeal
Download Presentation

Material cost variances

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Material cost variances Problem Q.paper April-2007 : In a firm budgeted- actual figure of the cost of Materials &direct labour cost incurred in the production during the month of march2007 are as under

  2. You are required to calculate M.C.V, MPV&MUV SOLUTION : calculation of standard quantity of actual output. for-> 400000 - 800000 360000 - ? 800000*360000/400000=720000

  3. Standard price = total cost /standard quantity = 4800000/720000=6.67 Actual price =total cost / actual quantity = 6006000/7280000=8.25 a) material cost variance: MCV =(SQ*SP) – (AQ*AP) =(720000*6.67) – (728000*8.25) = 4802400 – 6006000 = -1203600 (adverse)

  4. b) Material price variance: MPV = (SP-AP)* AQ = (6.67-8.25)*728000 = (-1.58)*728000 = -1150240 (adverse) c) Material usage variance: MUV =(SQ-AQ)*SP = (720000-728000)*6.67 = (-8000)*6.67 = -53360(adverse)

  5. Thank you ….! by swaroop