An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Soil and Water Road Condition Index SDTDC Prepared by: Carolyn Napper 10/06

  2. Project Update 10-17-06 • Literature search of existing indices • Internal search of FS road data collection tools and methodologies • Development of a draft index • Field testing of index nationally

  3. Maine S&PF BMP evaluation methodology developed by S&PF Partially funded by EPA and developed software program during beta-testing

  4. R-5 LTBMU • Characterization of roads for public information • WEPP as comparison

  5. R-5 Los Padres Closed road

  6. R-5 San Bernardino STEEP hillslopes Road segmentation

  7. R-2 Bighorn NF Existing survey by watershed Identify work, implement contracts to reduce sediment delivery to streams on all road levels.

  8. R-2 White River Road-stream connectivity Gully formation R-2 WCP handbook Breckenridge Ski Area

  9. R-6 Okanogan NF

  10. R-10 Tongass Subsurface Drainage

  11. R-9 White Mountain NF Level 2-gated URCI- Bob Eaton, process for evaluation of a road segment

  12. R-8 Ozark-St Francis TNC &FS road inventory Trimble w/Infra and Terra Sync software 10 mi/rd per day/crew

  13. R-8 Ouachita NF Road surveys for Roads analysis, NEPA, using WEPP, relative abundance of benthic fish tied to roads. Pursuing KV dollars for road improvement work. Infra data not reliable

  14. Goal of SWRCI Project • Need to measure the performance of the road improvement and road maintenance programs in meeting our responsibility for protecting watersheds. • Soil and Water road condition index • Photo Guidebook to determine SWRCI • Training module

  15. Road template/Surface Shape information • Stratify roads pre-post documentation • Focuses the reviewer on what they should anticipate from a given road • Insloped roads may have a ditch and relief culverts • Outsloped roads with drainage dips, may want to focus on road gradient, soil texture associated with that type of design. • Could be set up electronically

  16. Road-stream connectivity

  17. Soil Texture and WEPP

  18. Colors–Numbers-Adjectives • Pavement Condition Index 0-100 to rate pavement condition • SWRCI is additive, and the higher # is the rating • Could develop a rule set if a tie • Focuses on visual indicators • Useful in the ID team setting

  19. Page 2 of SWRCI • Environmental considerations • Causal factors for erosion and sediment transport • Site specific immediate concern issues

  20. Performance Accountability • USDA FS Strategic Plan Goal 5 Improve Watershed Condition • Program issues for CMRD include: • Lack of road maintenance $ = degraded forest road conditions. • Negative impacts to natural resources

  21. Key Outcome Measures of PAS • % of high clearance & stored roads incompliance with soil and water BMPs (R-10 uses RCS method)Unclear on how RCS identifies compliance and at what scale? • % of car passenger miles meeting soil and water BMPs (% of roads with no identified critical resource protection deferred maintenance needs) SWRCI can identify drainage, erosional concerns • Revised Infra 7/06 task list identifies critical resource=drainage (roadway, x-drain, erosion)

  22. National BMP & EP • On-going effort to develop a national program for all regions. • The effectiveness protocol will meet Goal 5-2 for monitoring water quality impacts of all activities on National Forest Service system lands. • Time frame estimate 18 months

  23. Needs or should be done… • Complete the documentation including references for each indicator. More pictures – limitation is due to • Develop a web page that would have all the existing forms being used. Showcase the forms, uses, and findings. Foster information exchange. • Form needs a software application to increase its use.

  24. Discussion, questions, next steps Discussion & FeedbackNext Steps