REDD+ FOR THE GUIANA SHIELD Technical Cooperation Project

REDD+ FOR THE GUIANA SHIELD Technical Cooperation Project. Session 1 – Past Activities and Suggestions for Reorientations. Marie Calmel , ONF International December 11 th , 2013 2 nd Steering Committee Meeting, Macapá. Prior remarks

zeki
Download Presentation

REDD+ FOR THE GUIANA SHIELD Technical Cooperation Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REDD+ FOR THE GUIANA SHIELDTechnical Cooperation Project Session 1 – Past Activities and Suggestions for Reorientations Marie Calmel, ONF International December 11th, 2013 2ndSteering Committee Meeting, Macapá

  2. Prior remarks • Expected activities based on the last Steering Committee Meeting (SCM) • Performed activities • Discrepancies and explanation • Proposition for adjustments Presentation outline

  3. Time and budget boundaries: • From 31st of July to 15th of December (+/-) • Include both the 1st SCM and the 2nd one (provisional total expenses for the December events) Prior Remarks

  4. As presented during the last SCM Expected activities

  5. Several comments : • Received during the launching SCM • Collected by the Focal Points and during project manager missions in the country • On the studies: • The involvement of forestry services in the studies should be prioritized. • Warning on the duplication risk with studies that have been already done in the region and that are planned to be done (but with different approaches) by the countries. • On the Working Groups: • Difficulty to find time to attend an important number of meetings (considering the under going activities). • For WG1 (Forest Cover Monitoring) and WG2 (Carbon Stock Assessment), the same experts will be sent by some of the countries. • Discussions on drivers of deforestation require national consultation before being brought to regional floor. NB: some countries (e.g. Guyana already performed this consultation work). Comments on those scheduled activities

  6. Between 1st of August and 15th of December 2013 Performed activities

  7. On December 5th and 6th in Georgetown • Objectives: • Share experiences among countries based on some presentations and open discussions • Talk about the Working Groups and get feedbacks on their organization, composition, as well as on specific topics that could be discussed during WG meetings. • Initiate technical dialogue among the countries. • Co-organized with CI (in order to avoid duplication) • 21 participants (IEF, SEMA, GFC, SBB, ONFI, CI) • Total Cost for the project : 10 k€ • Outcomes: • Feedbacks that have been taken into consideration for the SCM2 • Several presentations • A report under preparation Launching Working Group Meeting

  8. Identification of countries priorities • Preparation of studies and tools Program of activity preparation

  9. Consolidation of team Management and Operation

  10. Changes and adaptation to the comments and expectations • Team consolidation • Stepwise Discrepancies

  11. No change in the general objectives as well as in the project • No changes in the budget (per component) • Country level support • Regional platform and creation of tools Proposition for adjustment

  12. MERCI /THANK YOU /DANK U /OBRIGADA marie.calmel@onfinternational.com http://www.onfinternational.org Photo credit: ONF Guyane