210 likes | 319 Views
WP3: Harmonizing technological aspects. Wilhelm Petersen Helmholtz-Zentrum Geesthacht (HZG) Institute of Coastal Research. WP3: Harmonizing technological aspects. General Objectives:
E N D
WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum Geesthacht (HZG) Institute of Coastal Research PARIS – Maison de la recherche - 24 & 25 May 2011
WP3: Harmonizing technological aspects • General Objectives: • To provide a common base for the operational use of FerryBoxes, gliders, fixed platforms along European coasts • To review the current status of existing systems in operational use in European seas • To define the best technical practices for compatible, robust and cost-effective systems • To define procedures for harmonizing and merging quality assessed FerryBox and Fixed Platform data at regional (ROOS) level • To define procedures and technological solutions for integration and testing of new sensors on these systems PARIS – Maison de la recherche - 24 & 25 May 2011
WP 3: Task 3.1 FerryBox Objectives: • review current status of existing FB systems (e.g. sensors, quality control,data handling): • review best technical practices of the existing FB systems • harmonize the resulting data • provide technological solutions to integrating new sensors (from WP10) into FBs • define consensual procedures for using FerryBox data in validation of earth observation data Tasks: • 3.1.1: Review current status of existing FB systems (flow-through systems, sensors, quality control, data handling) • 3.1.2: Best practice of FB systems (flow-through system, sensors, operation procedures, antifouling, control mechanisms, data handling) • 3.1.3: Harmonization and merging quality assessed data from FB systems in ROOS regions • 3.1.4: Test and integration of new sensors and best practices (tightly linked to WP10. PARIS – Maison de la recherche - 24 & 25 May 2011
WP 3: Task 3.2 Gliders Objectives: • Review the current status of the existing glider fleet in operational use in European seas. • Define the best technical practices for operation of a fleet of gliders (general strategies for glider operation in coastal and shallow areas, implementation of tools for path planning…) Tasks: • 3.2.1 Review current status of glider operations in Europe (in coordination with the Gliding Observatories network) • 3.2.2 Define the best technical practices for operation a fleet of glider PARIS – Maison de la recherche - 24 & 25 May 2011
WP 3: Task 3.3 Fixed Platforms Objectives: • reviewing the current status of existing systems in operational use in Europe • defining best technical practices for compatible, robust and cost-effective systems on a variety of fixed platforms • defining procedures for harmonizing and merging quality-assessed high-frequency in situ data across regional seas (e.g. the North Sea) • identifying gaps in the present coverage • proposing technological solutions for the integration and testing of new sensors on fixed platforms • sharing data with mobile platforms and remote sensing to create new integrated products PARIS – Maison de la recherche - 24 & 25 May 2011
WP 3: Task 3.3. Fixed Platforms (continue) Tasks: • 3.3.1 Review of the current status of all existing fixed observing sites in European waters • 3.3.2 best practiceof fixed platform technology • 3.3.3. Harmonization and merging quality assessed data from fixed platform systems in ROOS regions • 3.3.4.Comparison of new sensors and assessment of their applicability for fixed platforms (strong relationship to WP10) PARIS – Maison de la recherche - 24 & 25 May 2011
WP 3: Deliverables & Milestones Deliverables • D 3.1:Report on current status of FerryBox systems M09 • D 3.2: Report on current status of gliders observatories M15 • D 3.3: Review of current marine fixed instrumentation M21 • D 3.4: Report on new sensor developments M36 • D 3.5: Conclusion report M42 Milestones: • MS28 Report on activities M42 PARIS – Maison de la recherche - 24 & 25 May 2011
Contributions of partners to WP3 partners in total: 17 budget: ~550 T€ total personal month: 105 PARIS – Maison de la recherche - 24 & 25 May 2011
Task leaders: • Task 3.1 FerryBox: NERC (David) & NIVA & SYKE Dominique & Seppo • Task 3.2 Glider: CSIC (Simon) • Task 3.3. Fixed Platform: CNR (Stefania) • Task 3.x.3 test & application of new sensors: HZG (Willi) PARIS – Maison de la recherche - 24 & 25 May 2011
WP 3: Task 3.1 FerryBox Action (working plan) first year: FerryBox (responsible David Hydes): • review current status FerryBox : • questionnaire WP4 <>WP3 <-> WP2 • D 3.1. report status FerryBox (M09 = Jan 2012) • review best practiseentire infrastructural chain of data acquisition from: sensor (performance, robustness, accuracy, etc.) to supporting system (cabling, electric and electronic components, critical sub systems such as debubbling, pumping, etc.). WP3 <-> WP4 • First Workshop on 30 – 31. August 2011 (connected to 4th FB-Meeting (1-2 Sept at HZG) Organizer: David, Willi, support by Seppo & George? PARIS – Maison de la recherche - 24 & 25 May 2011
WP 3: Task 3.2 Glider Action (working plan) first year: Glider (responsible Simon Ruiz): • Review current status of glider operations in Europe via questionaire, workshop?(in coordination with the Gliding Observatories network) D 3.2. report status glider (M15 = Jul 2012) PARIS – Maison de la recherche - 24 & 25 May 2011
WP 3: Task 3.3 Fixed Platforms Action (working plan) first year: Fixed Platform (responsible Stefania Sparnocchia): • review current status of all existing fixed observing sites • questionnaire (merged with the FB questionnaire) WP3 <-> WP2 including stations outside of consortium subdivided by the different ROOS’s • review best practise • Planning a Workshop WP3 <-> WP4 (first months 2012?) D 3.3. report status fixed platforms (M21 = Jan 2013) PARIS – Maison de la recherche - 24 & 25 May 2011
WP 3: Task 3.3.4 New Sensors Action (working plan) first year: New Sensors (responsible Willi Petersen): • Status of application of new sensors WP3 <-> WP10 Output of questionnaire • assessment of their applicability for FerryBox and fixed platforms (+ Gliders??). • Which new sensors are available • Suitability for unattended operation (sort of platform) • Requirements for unattended operation (power consumption, maintenance, data handling) • biofouling aspects (WP3 <-> WP4) PARIS – Maison de la recherche - 24 & 25 May 2011
WP3: Time table for the entire project PARIS – Maison de la recherche - 24 & 25 May 2011
WP3: Time table until 2012 PARIS – Maison de la recherche - 24 & 25 May 2011
WP3: open questions • Overlap WP3 > WP4 • Connection to WP10 (e.g. defining standards, protocols, QA for new sensors) PARIS – Maison de la recherche - 24 & 25 May 2011
First steps: 1st draft of a common (WP 2, 3 and 4)questionaire (together with WP2 and WP4) (first focused on FerryBox activities): WP2 : • Institutions • List of platforms (question: which stations should be involved (definition of what belongs to coastal systems) • Contact • Parameter • Public access PARIS – Maison de la recherche - 24 & 25 May 2011
cont. 1st draft questionaire WP3 & WP4: • Standard Sensors/Parameter: • Type of sensors, experiences • Experimental parameter (new sensors WP10) • New Sensors/Parameters • parameter • status (experimental, pre-operational…) • experiences • Resolution in space and time • FB: • frequency of data sampling spatial resolution (in case of FB) • repetition rate of transects on the route • Fixed stations • frequency of data sampling • covered time period PARIS – Maison de la recherche - 24 & 25 May 2011
cont. 1st draft questionaire Quality assessment (sorted by parameter) • methods of QA • frequency of calibration checks • frequency of taking reference samples • real-time (automatic) data quality checks (e.g. tests of outlier, gradient ….) • post processing, how data are corrected • visibility of QA for external users (e.g. flags and/or metadata) Data handling: • data transfer (real time or in harbour, automatically, manually …) • data storage (files, database …) • public access of data, WP4 specific: • Calibration Facilities … PARIS – Maison de la recherche - 24 & 25 May 2011
WP3: Personal month per partner PARIS – Maison de la recherche - 24 & 25 May 2011
WP3 Links PARIS – Maison de la recherche - 24 & 25 May 2011