1 / 5

Report

API SC 17 Subcommittee on Subsea Production Systems API RP 17U Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment January 2013-Report. Report. As part of the subcommittee towards RP 17U, the work realized includes the following:

zenia
Download Presentation

Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. API SC 17 Subcommittee on Subsea Production SystemsAPI RP 17URecommended Practice for Wet and Dry ThermalInsulation of Subsea Flowlines and Equipment January 2013-Report

  2. Report As part of the subcommittee towards RP 17U, the work realized includes the following: • Previous Work Concluded (Wet/Dry Insulation, Draft approved-with comments) • Current Activities (Addressing comments provided by API17 members)

  3. Participant Members

  4. Previous Activities • Work with the group members has concluded and the Draft recommended practice was submitted for ballot. • Recommended Practice RP 17 U has been approved with comments

  5. Current Activities • Incorporating comments from the API 17 group. • Addressing non-technical comments • Communication with the API 17 members that provided comments in order properly address them. • Time for completion and addressing all comments by June 2013.

More Related