1 / 8

Environmental Information System Development – Status Update

REReP 1.8 Wrap-up/Training Workshop June 19-20, 2003 Sofia, Bulgaria. Kosovo/a. Environmental Information System Development – Status Update. Current Status I. Institutional set-up -All institutions re-established --June 1999 Department of Environment – May 2000

zeno
Download Presentation

Environmental Information System Development – Status Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REReP 1.8 Wrap-up/Training Workshop June 19-20, 2003 Sofia, Bulgaria Kosovo/a Environmental Information System Development – Status Update

  2. Current Status I • Institutional set-up • -All institutions re-established --June 1999 • Department of Environment – May 2000 • Ministry of Environment and Spatial Planning – March 2002 • -Establishment of the Environmental Agency still pending • Legal framework • -Basic legal framework endorsed • Environmental Protection Law including information access adopted in April 2003 • - Laws or standards for monitoring and reporting will derive from the EPA • Data collection and management • -No regulation of the monitoring system • -Limited monitoring data exchange, assessment and dissemination • - No systematic, objective data collection

  3. Current Status II • Information dissemination – • - Printed publication : a monthly printed publication with relevant environmental information is planned (three languages) • - First State of Environment Report published on April 2003 • - Pilot local environmental Information Web page (under construction) • Use of environmental reporting in decision making • -High demand for environmental information for these purposes, but low supply

  4. Tangible Developments & Progress • Objectives: Development of the monitoring system in Kosovo/a • - Equipment for water monitoring and training for the KHMI laboratory • Expenditures - Equipment and training: 27.800 Euro

  5. Tangible Developments & Progress • Benefits • -Initiated further development of the environmental information system in Kosovo/a • - ensures the accuracy of water quality measurements, timeliness and cost effectiveness. • -contributing to the reliability and accuracy of the data for the MESP, and for its subsequent dissemination to the general public and media

  6. Future Priorities • Foreseen actions • -Technical infrastructure: monitoring system for water, soil and air pollution; Hardware and Software for data interpretation • -Institutional strengthening: training and expertise in network management, data interpretation and standards • -Legal frameworks: Extension of legal framework including definition of standards • -International cooperation: integration in international reporting regimes

  7. Future Priorities • Available funding • -donor support by the Italian Government for the Kosovo/a Hydro-meteorological Institute laboratory, and by the central governmental budget of Kosovo/a • Required assistance • -financial resources for monitoring, software, capacity & institutional building.

  8. Further Information…. Tomor Qela Address: MESP, Nazim Gafurri Str. 31 Tel: +381(0)38 200 32 120 Fax: +381(0)38 517 802 E-mail:tomori2000@hotmail.cominfo@gismesp.tk And please visit us at the exhibition!

More Related