Post-mortem of Experience with LEIR Controls

Post-mortem of Experience with LEIR Controls. Sergio Pasinelli on behalf of the LEIR commissioning team. Outlines. Introduction Generalities Needs Schedules Status in 2005 Request for 2006 Conclusions. The Deal.

zeno
Download Presentation

Post-mortem of Experience with LEIR Controls

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Post-mortem of Experience with LEIR Controls Sergio Pasinelli on behalf of the LEIR commissioning team

  2. Outlines • Introduction • Generalities • Needs • Schedules • Status in 2005 • Request for 2006 • Conclusions S. Pasinelli

  3. The Deal • From CO: To test and validate, in an operational environment, certain choices suggested for the control of the LHC • From OP: The new tools will have to provide the same functionalities, availability and reliability which are currently proposed by the CPS. S. Pasinelli

  4. Description • LEIR is between LINAC 3 and the PS. • The Control system of the LINAC 3 and PS, is that of the CPS • LEIR is a hybrid control system, composed of elements from the CPS and LHC S. Pasinelli

  5. We are Here S. Pasinelli

  6. Control needs for commissioning • Sequencing / Timing • Basic controls (WS + Knobs) • Observation & Instrumentation • Function editor / Cycle editor (LSA) • Tools • Alarms • Archives / References S. Pasinelli

  7. DSC Structure for the commissioning CBCM Working set & Knobs Cycle & Function Editor Observations & Instrumentations Tools Alarms Passerelle Archives & Ref. Application Server (if necessary) Middleware GM FESA LEIR Equipments S. Pasinelli

  8. Schedule • Hardware Commissioning : Basic control & Sequencing available at the beginning of May • Beam injection : Partial Controls & Observation of the injection lines available at the beginning of June. • Ring : Full Controls & Observation available at the beginning of August. • Ejection : Control available at the beginning of February 2006. S. Pasinelli

  9. Status Hardware Commissioning (May) Controls with Xmotif/C++ • Console manager On time • Working set / Knobs On time • Function editor On time • Alarms On time • FE software GM On time • CBCM On time S. Pasinelli

  10. Status Hardware Commissioning (May) Controls with Java • CCM Debugging • Working set / Knobs NOT READY • FE Framework FESA NOT READY • LTIM On time • POWDF7000 NOT READY • Reboot DSC NOT READY S. Pasinelli

  11. Status Injection (June) Controls with Java • MTV On time • CCM Debugging • OASIS Hard Debugging • Working set / Knobs NOT READY • Alarms (LASER) NOT READY • Workstation memory leak 1GB not enough S. Pasinelli

  12. Status Injection (June) • FE Framework FESA NOT READY • POWDF7000 NOT READY • BTV On time • Reboot DSC NOT READY S. Pasinelli

  13. Status Ring (September) Controls with Java • CCM • WS memory leakIncrease memory to 2GB • Orbit correctionOn time • Working set / KnobsDebugging • Alarms (LASER)Partial • OASIS Debugging • Cycle editor (LSA)Debugging • ReferencesNOT READY • ArchivesNOT READY S. Pasinelli

  14. Status Ring (September) Controls with Java (con’t) • PPM CopyNOT READY • EQP SurveyNOT READY • PasserellePartial only GM • FE Framework FESADebugging • POWDF7000Debugging • Septa • Semgrid PLC • Reboot DSC S. Pasinelli

  15. Status end 2005 Controls with Java • CCM • WS memory leak • Working set / Knobs • Orbit correction • References • OASIS Optimization • Cycle editor (LSA) Optimization & GUI • Alarms (LASER) Partial S. Pasinelli

  16. Status end 2005 Controls with Java (con’t) • ArchivesNOT READY • PPM CopyPartial only for GM • EQP SurveyNOT READY • PasserellePartial only for GM • FE Framework FESA • FESA Classes • POWDF7000 • Septa • Semgrid PLC • Orbit S. Pasinelli

  17. Objectives 2006 • Controls with Java • Cycle editor (LSA) Optimization • Archives Ready • Alarms Full functionalities • PPM Copy For GM and FESA • Passerelle For GM and FESA • OASIS Improve speed connection • EQP Survey Ready • Cycle editor (LSA) GUI improvement S. Pasinelli

  18. Conclusions • Use of LHC controls for LEIR very ambitious • Schedules not respected • Many softwares not ready • Communication lack between CO projects • The CO priorities for LEIR softwares to low • CO effort for LEIR in autumn • Tests TI8 and TT40 was not enough for LEIR S. Pasinelli

  19. Conclusions • There can be an inconsistency between the supercycle from “Cycle Editor" and from the MTG with the long plateau • CPS & CSL knowledge used in the LEIR softwares • Excellent support and reactivity from softwares developers • The effort must continue, the commisionning is not finished! S. Pasinelli

  20. Conclusions A Control system allowing working (but not yet perfect) is available S. Pasinelli

  21. Acknowledgements • Thanks to all people involved in the LEIR softwares. • Specially • E. Roux, I. Kozsar, M. Pace, V. Baggiolini • CO Team • LSA Team • BDI Team • PO Team • Vacuum Team • OP Team S. Pasinelli

  22. Module GM POW-V / POWP GFA CTIM Sampler SKSU BBTRM Etc … Module FESA LTIM Dpow7000 LeirSeptaStatic BCTFT QMeter MTV Etc… LEIR GM - FESA S. Pasinelli

  23. S. Pasinelli

  24. S. Pasinelli

  25. S. Pasinelli

  26. S. Pasinelli

  27. S. Pasinelli

  28. S. Pasinelli

  29. S. Pasinelli

  30. S. Pasinelli

  31. S. Pasinelli

  32. S. Pasinelli

  33. S. Pasinelli