1 / 29

Controls for LEIR

Controls for LEIR. AB/CO Technical Committee - 18 th March 2004 V.Baggiolini S.Jensen M.Pace http://leir-proj-controls.web.cern.ch/. Outline. LEIR Machine Generalities Commissioning Planning LEIR Controls Scope Architecture Sequencing & Timing Hardware Front end Software

Download Presentation

Controls for LEIR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Controls for LEIR AB/CO Technical Committee - 18th March 2004 V.Baggiolini S.Jensen M.Pace http://leir-proj-controls.web.cern.ch/

  2. Outline • LEIR Machine • Generalities • Commissioning Planning • LEIR Controls • Scope • Architecture • Sequencing & Timing • Hardware • Front end Software • Application Software • General Services • Conclusions – Issues’ summary

  3. Outline • LEIR Machine • Generalities • Commissioning Planning • LEIR Controls • Scope • Architecture • Sequencing & Timing • Hardware • Front end Software • Application Software • General Services • Conclusions – Issues’ summary

  4. The LHC Injector Chain 2.76 TeV/n Pb-Pb 177 GeV/n Pb 6 GeV/n Pb LEIRLow Energy Ion Ring 72MeV/n - 4.5 E8 Pb/cycle LEIR 72 MeV/n Pb

  5. RF Injection E- cooler The LEIR Layout Ejection LEARRing

  6. Outline • LEIR Machine • Generalities • Commissioning Planning • LEIR Controls • Scope • Architecture • Sequencing & Timing • Hardware • Front end Software • Application Software • General Services • Conclusions – Issues’ summary

  7. From Common Control Room From Local Control Room Commissioning Planning

  8. Outline • LEIR Machine • Generalities • Commissioning Planning • LEIR Controls • Scope • Architecture • Sequencing & Timing • Hardware • Front end Software • Application Software • General Services • Conclusions – Issues’ summary

  9. PSB New Power Converters PPM 1 AQN / injection 2 CCVs / cycle for inj & ej IEL ITE FILTER Injection: new septum + upgraded kicker & bump ETL LINAC3 PS EE New E ramping cavity Repetition Rate 5 Hz Source Improved vacuum Powerful e- cooler New Converters New RF LL EI Pulsing at 10 Hz (continuous) LEIR ER LEIR Controls: Scope

  10. T T T LEIR Controls: Architecture PUBLIC ETHERNET NETWORK OPERATOR CONSOLES FIXED DISPLAYS OPERATOR CONSOLES TCP/IP communication services FILE SERVERS APPLICATION SERVERS SCADA SERVERS CERN GB ETHERNET TECHNICAL NETWORK TCP/IP communication services TIMING GENERATION RT Lynx/OS VME FRONT ENDS PLCs T T T T TCP/IP communication services OPTICAL FIBERS PROFIBUS BDI, RF, PC, Kicker, … Vacuum. other LHC MACHINE

  11. Outline • LEIR Machine • Generalities • Commissioning Planning • LEIR Controls • Scope • Architecture • Sequencing & Timing • Hardware • Front end Software • Application Software • General Services • Conclusions – Issues’ summary

  12. Scheme A Scheme B Isolde CPS Isolde CPS P+ P+ IONS P+ IONS IONS P+ PSB LEIR PSB LEIR P+ IONS P+ IONS IONS Linac 2 Linac 3 Linac 2 Linac 3 TGM ?? Accepted in May 2003 TGM 1 TGM 2 Timing & Sequencing: Preliminary Decision

  13. LBS PSB LBE MSG50 SLVH10 SLVH10 Lin2 -PSB Telegram BHZ40 MSF40 LTB MSF30 ITHS SLH MSG BHZ30 ITE ITH LT D10 BHZ14 ITFS BHZ20 MSG ITF LTE LTL BHZ11 ETL Stripper BHZ10 ITL ECR source EE EI P+ source LEIR Lin3 -LEIR Telegram

  14. Ejection Injections Electron cooling Acceleration Timing & Sequencing : Operational Requirements LEIR is PPM (Pulse to Pulse Modulated) NORMAL Operation Nominal : 3.6s cycle Early Mode: 2.4s cycle

  15. Timing & Sequencing : Operational Requirements (cont’d) MD / Commissioning Operation • Very long injection plateaus • Purpose: perform life-time measurements,…. • Arbitrary length (> 10 sec) • No acceleration neither extraction • No synchronisation with PS (LEIR is stand-alone)

  16. Timing & Sequencing : AB/CO Proposal • 2 operational modes • Nominal Mode • PS and Lin3 - LEIR are coupled • PS and LEIR share the same SC length • MD Mode • New MTG dedicatedto this mode • PS and Lin3 - LEIR are decoupled. LEIR is standalone • LEIR SC length is arbitrary • Fully integrated into CBCM • Standard facility – Relies on Supercycle sequence • Deployed @ SPS in 2004 • MTG Master/ Slave switching mechanism - Remote ctl

  17. MD Operation: Very long injection plateausSequence of supercycles Example 1 Current .... F1 F1 F1 F1 F1 F1 F1-out F1-in Supercycle with 3 flat cycles Supercycle with 3 flat cycles lead-in supercycle lead-out supercycle Arbitrary number of executions Example 2 Current .... F1 F1 F1 F1-in F1 F1-out LHC-early lead-in lead-out “normal” supercycle Arbitrary number of executions

  18. Outline • LEIR Machine • Generalities • Commissioning Planning • LEIR Controls • Scope • Architecture • Sequencing & Timing • Hardware • Front end Software • Application Software • General Services • Conclusions – Issues’ summary

  19. Outline • LEIR Machine • Generalities • Commissioning Planning • LEIR Controls • Scope • Architecture • Sequencing & Timing • Hardware • Front end Software • Application Software • General Services • Conclusions – Issues’ summary

  20. Outline • LEIR Machine • Generalities • Commissioning Planning • LEIR Controls • Scope • Architecture • Sequencing & Timing • Hardware • Front end Software • Application Software • General Services • Conclusions – Issues’ summary

  21. General Services : Monitoring • Requirements from May 2005 • Interactive tool for operators: survey + remote reset of computers • To be monitored: • All Front Ends • All Back Ends • All PLCs connected to the CO system (RF, vacuum,PC,…) • Requirements not specific . Fully addressed by the new Monitoring System provided by ABCOIN.

  22. CAREFUL CRITICAL (No HR affected) General Services : OASIS • Requirements from May 2005 • Full nAos functionality • High priority for machine physicists • 1 common triggering for Lin3-LEIR-PS • OASIS Mandate for 2005 • OASIS deployment on all machines • nAos phased out • Issues: missing staff • FE / Business Tier: 0.5 FTE • GUI Application: 0.5 FTE • Project in standby now • Recommandations • Prioritization of operational requirements (pre-requisite for staffing) • Decision on staffing for GUI: mandatory for 1st April 2004 • Potential risk of having NO complete observation system

  23. General Services : Alarms • Not possible today to foresee which Alarms system will be deployed for LEIR • More accurate estimate by end of May 2004 • 2 possible solutions for LEIR commissioning

  24. LASER Service Broker PS Gateway Old-New PS : Existing USP PS NEW USP FESA Current New Gateway If initial schedule is met

  25. PS LASER LASER Service PS Alarm System Alarm console PS Gateway New-Old Broker PS exisitng USP PS new USP FESA Current New Gateway If initial schedule is NOT met

  26. General Services : Alarms • Not possible today to foresee the Alarms system for LEIR in 2005 • More accurate estimate by end of May 2005 • 2 possible solutions • Whatever the solution, for new LEIR equipment : Need of LASER source API integration into FESA framework

  27. Conclusion & Issues • Commissioning LEIR looks challenging ! • LEIR = test-bed for lots of new systems • Timing Receiver Cards • Integration of DSP HW • FESA framework • Console Manager + AP Framework • LASER • OASIS • Monitoring System

  28. Conclusion & Issues • Commissioning LEIR looks worrying ! • Some concerns from the USER team • New machine with new systems • Some concerns from the LEIR CO team • Technical issues • Human Resource issues • Lots of issues to be addressed to meet the schedule!