1 / 9

WMO en WMS

WMO en WMS. BESTUUR EN MR EEN TRANSPARANTE RELATIE Anton Kotte Monique Bouwens 1. POSITIEF: NEGATIEF: INSPRAAK COMMUNICATIE BETROKKENHEID LOG APPARAAT DRAAGVLAK MIDDELEN OPENHEID DESKUNDIGHEID RELATIE INFORMATIE

Download Presentation

WMO en WMS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WMO en WMS BESTUUR EN MR EEN TRANSPARANTE RELATIE Anton Kotte Monique Bouwens 1

  2. POSITIEF:NEGATIEF: INSPRAAK COMMUNICATIE BETROKKENHEID LOG APPARAAT DRAAGVLAK MIDDELEN OPENHEID DESKUNDIGHEID RELATIE INFORMATIE INFORMELE SFEER TIJDPAD BELEID MAKEN BEZETTING ACHTERBAN PLUS en MIN

  3. 1981 -1992- 2007 WETGEVING WMS VOORLICHTING 2 WMO EN WMS

  4. HETZELFDE DOEL ONDERSCHEIDEN BELANGEN 3 WMO EN WMS

  5. VERANDERINGEN: POSITIE GMR MANAGEMENTSTATUUT MEDEZEGGENSCHAPSSTATUUT LEERLINGEN EIGEN GELEDINGEN SPIEGELBEPALING KEUZEMOGELIJKHEDEN VORMGEVING GESCHILLENREGELING ONTHEFFING VERVALT 4 WMO EN WMS

  6. SPELERS INFORMATIE COMMUNICATIE BESLUITVORMING 5 WMO EN WMS

  7. Verplicht volgens CAO: VOORZIENINGEN REGELING PERSONEEL GELD: € 856, -/ € 2568, - VACATIEGELD JA OF NEE? FACILITEITEN

  8. WAAR WORDT OVER BESLOTEN? AGENDAPLANNING VADEMECUM INFORMATIE/COMMUNICATIE 6 WMO EN WMS

  9. VERANTWOORDING TOEZICHT HARMONISATIE WETGEVING 7 WMO EN WMS

More Related