30 likes | 273 Views
• December 2012. ENTERED :. • JCS « NC « Kazakstan Temir Zholy » (50%). PARTICIPANTS :. • «Alstom Transport S.A.» ( France ) (25%). • CJCS « TransMashHolding » ( Russia ) (25%). • 10,6 billion tenge (71 million dollars ). PROJECT COST :. • Up to 100 sections per year. CAPACITY :.
E N D
•December 2012 ENTERED: •JCS «NC «Kazakstan Temir Zholy» (50%) PARTICIPANTS: • «Alstom Transport S.A.» (France) (25%) •CJCS «TransMashHolding» (Russia) (25%) • 10,6 billion tenge (71 million dollars) PROJECT COST: •Up to 100 sections per year CAPACITY: •actual: 24% •planned: 53% (2017) LOCALIZATION: • 75,8 million tenge (410 thousand dollars) LABOUR PRODUCT-TY: •actual: 168 •planned: 380 (2016) JOBS: ELEKTROVOZ KURASTYRU ZAUTY INDICATORS PRODUCT Freight AC electric locoKZ8A Passenger AC electric locoKZ4A
FreightAC electric locoKZ8A PassengerAC electric locoKZ4A Advantages: Energy saving up to 20% Speed increase up to 10% Weight of train increase by30% Three times extended maintenance cycle
Further steps in the localization Subject to the development of production of these components within the EAEU level of production localization KZ8A will be more than 50% Traction motor Converters 2015 + 6 % + 38% 2016 2014 Brakes Traction transformer +7% + 7% 2017