1 / 19

Update on Metop -B MGVI

Update on Metop -B MGVI. Wei Guo and Felix Kogan 01/16/2013. Contents. Verification on geo-location of Metop -B at initial stage Verification on VIS and NIR band s of Metop -B at initial stage Current status of Metop -B NDVI and BT

zia
Download Presentation

Update on Metop -B MGVI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update onMetop-B MGVI Wei Guo and Felix Kogan 01/16/2013

  2. Contents • Verification on geo-location of Metop-B at initial stage • Verification on VIS and NIR bands of Metop-B at initial stage • Current status of Metop-B NDVI and BT • Update on MGVI system  VHP GVI composer (avhrr_gvi.exe) • Major change on VHP GVI composer (avhrr_gvi.exe)

  3. Middle East 10/19 and 10/22/2012

  4. Middle East 10/19 and 10/22/2012

  5. Middle East 10/19 and 10/22/2012

  6. Post launch Calibration Figure 1. The seasonal reflectance oscillation is derived from MetOp-A AVHRR visible channel and the MetOP-B AVHRR visible calibration update is performed using the seasonal oscillation trending. Initial On-Orbit Calibration Update of METOP-B AVHRR Solar Channels: The solar bands of Advance Very High Resolution Radiometer (AVHRR) must be calibrated vicariously on orbit, which requires an empirically derived Bi-directional Reflectance Distribution Function (BRDF). For AVHRR on a newly launched satellite, the BRDF will not be available until 18 months after launch. An established method that has been used since NOAA-18 is to use the BRDF derived from an instrument on similar orbit. This has been applied to METOP-B, using the BRDF from METOP-A, and the calibration coefficient updates of 0.951, 1.085, and 1.205 have been recommended for Channels 1, 2, and 3A, respectively. Recently, STAR scientist developed another method of inter-calibration of MetOp-B AVHRR using MetOp-A AVHRR as reference, with the consideration of solar zenith angle effects and sensor zenith angle effects. This method results in the calibration coefficient updates of 0.961and 1.087 for channel 1 and 2, which are consistent with the other method. These initial calibration updates are ready to deliver to OSPO for implementation. (Contact: Tiejun Chang, tiejun.chang@noaa.gov and Xiangqian Wu, xiangqian.wu@noaa.gov)

  7. AVHRR visible channel calibration and consistency NDVI verification Before and after MetOp-B calibration update Initial post-launch calibration coefficient (S) for Metop-B Provided by Xiangqian Wu and Tiejun Chang on 11/23/2012 Rpost= Rpre * S Weekly NDVI from MetOp-A/B

  8. BT4, 2013, week2 METOP-A METOP_B

  9. NDVI, 2013, week2 METOP-A METOP_B

  10. NDVI

  11. BT4

  12. MGVI system  VHP GVI composer (avhrr_gvi.exe) • VHP GVI was developed from MGVI • MGVI system is not updated any more, should be replaced by VHP GVI. • VHP GVI algorithm was improved • VHP GVI is easier to maintain (simple procedure) • Difference on GVI product between VHP GVI and MGVI • File name is slightly difference • All other is invisible to operators or end user

  13. What need to do run VHP GVI • Existing VHP GVI (avhrr_gvi.exe) should be able to run for METOP A and B without change • Need: • Configure file • Calibration files (Both pre- and post-launch)

  14. Pre-launch Calibration file [pre-launched calibration, version 3] #Sat, CH Slope_loInt_loSlope_hiInt_hiBreakPoint for NOAA 15 -19,M2, source: http://www.star.nesdis.noaa.gov/smcd/spb/fwu/solar_cal/AVHRR_Prelaunch_CalCoeff.html NK CH1: 0.0567 -2.1590 0.1635 -55.1800 496.6700 NK CH2: 0.0563 -2.1370 0.1630 -55.2900 498.2100 NL CH1: 0.0525 -2.0410 0.1529 -51.9800 497.5300 NL CH2: 0.0513 -1.9480 0.1511 -51.8700 500.3200 NM CH1: 0.0554 -2.2130 0.1627 -55.9900 501.1200 NM CH2: 0.0543 -2.1510 0.1618 -55.9900 500.7300 NN CH1: 0.0545 -2.1790 0.1613 -55.6300 500.5400 NN CH2: 0.0526 -2.0840 0.1584 -55.0700 500.4000 M1 CH1: 0.0536 -2.1099 0.1587 -54.7510 500.6200 M1 CH2: 0.0518 -2.092333 0.1526 -52.8065 503.0000 M2 CH1: 0.0537 -2.1720 0.1587 -54.7800 501.0100 M2 CH2: 0.0545 -2.1670 0.1619 -55.9100 500.4200 NP CH1: 0.0551 -2.1415 0.1625 -55.8630 496.4300 NP CH2: 0.0549 -2.1288 0.1635 -56.4450 500.3700 [END] [Basic information of NOAA AVHRR satellites] [launch date] #sat, launch_date NC: 06/23/1981 NF: 12/12/1984 NH: 09/24/1988 NJ: 12/30/1994 #below was copied from http://www.star.nesdis.noaa.gov/smcd/spb/fwu/solar_cal/AVHRR_Prelaunch_Cal NK: 05/13/1998 NL: 09/21/2000 NM: 06/24/2002 NN: 05/20/2005 M2: 10/19/2006 NP: 02/06/2009 M1: 09/17/2012 [pre-launched calibration, version 2] # current active ! # A= Slope * C + Intercept (reflectance in percentage) #Sat, CH Slope_loInt_loSlope_hiInt_hiBreakPoint for NOAA7,9,11,14, source: http://www2.ncdc.noaa.gov/docs/podug/html/c3/sec3-3.htm NC CH1: 0.1068 -3.4400 0 0 1024 NC CH2: 0.1069 -3.488 0 0 1024 NF CH1: 0.1063 -3.8464 0 0 1024 NF CH2: 0.1075 -3.8770 0 0 1024 NH CH1: 0.0906 -3.730 0 0 1024 NH CH2: 0.0900 -3.390 0 0 1024 NJ CH1: 0.1081 -3.8648 0 0 1024 NJ CH2: 0.1090 -3.6749 0 0 1024

  15. Pre-launch Calibration file #post-launch calibration with the most recent update. #data source= http://www.star.nesdis.noaa.gov/smcd/spb/fwu/homepage/AVHRR/Op_Cal_AVHRR/Op_Cal_AVHRR.html #Sat CH Update Data Center Constant Deg. Rate sin cos Amp. Angle Mean Ratio Slope_loInt_loSlope_hiInt_hi NL CH1: 12/22/2012 09/07/2007 01/26/2013 38.7391 -0.1277% -0.4390 -0.4089 0.5999 42.96 32.98 1.1462 0.06002 -2.314 0.1752 -59.54 NL CH2: 12/22/2012 09/07/2007 01/26/2013 40.5308 -0.1742% -0.1953 -1.3403 1.3544 81.71 32.67 1.3039 0.06687 -2.526 0.1970 -67.62 NM CH1: 09/28/2010 09/24/2010 10/26/2010 39.5504 -0.0995% -0.2193 0.4581 0.5079 -64.42 36.52 1.0351 0.05737 -2.296 0.1684 -57.94 NM CH2: 09/28/2010 09/24/2010 10/26/2010 37.0158 -0.1198% -1.0015 0.0726 1.0041 -4.15 33.37 1.2768 0.06944 -2.726 0.2067 -71.57 NM CH3: 09/28/2010 09/24/2010 10/26/2010 59.2315 -0.2189% 0.0068 1.3414 1.3414 89.71 52.56 1.2728 0.03373 -1.422 0.2364 -103.22 NN CH1: 12/22/2012 11/24/2012 01/26/2013 39.9212 -0.1307% 0.0813 0.6818 0.6866 83.20 36.25 1.0428 0.05631 -2.220 0.1679 -57.74 NN CH2: 12/22/2012 11/24/2012 01/26/2013 38.7307 -0.1483% -0.8954 0.7503 1.1682 -39.96 34.56 1.2325 0.06520 -2.569 0.1956 -68.16 NP CH1: 12/22/2012 12/17/2012 01/26/2013 41.0928 -0.0608% 0.6477 -0.1368 0.6620 -11.93 40.21 0.9401 0.05179 -2.013 0.1528 -52.51 NP CH2: 12/22/2012 12/17/2012 01/26/2013 42.0378 -0.1568% 1.1361 0.6519 1.3099 29.85 39.76 1.0714 0.05881 -2.281 0.1752 -60.47 M2 CH1: 12/22/2012 12/21/2012 01/26/2013 39.1527 -0.0998% -0.1953 -0.3816 0.4287 62.90 36.86 1.0254 0.05508 -2.227 0.1627 -56.17 M2 CH2: 12/22/2012 12/21/2012 01/26/2013 38.5213 -0.1454% 0.4102 -1.0826 1.1577 -69.25 35.19 1.2106 0.06600 -2.623 0.1960 -67.69 M2 CH3: 12/22/2012 12/21/2012 01/26/2013 58.1910 -0.1988% -0.9484 -0.6136 1.1296 32.90 53.64 1.2473 0.03299 -1.356 0.2291 -99.80 M1 CH1: 11/23/2012 11/23/2012 11/23/2012 0.0514560 -2.0255039 0.1523520 -52.5609589 M1 CH2: 11/23/2012 11/23/2012 11/23/2012 0.0563066 -2.2743661 0.1658762 -57.4006653 The parameters for METOP-B was calculated from the initial calibration parameters ( S1=0.96, S2=1.087 ) provided by Tiejun Chang and Fred Wu on 11/23/2012.

  16. Recent Improvement on VHP system • AVHRR GVI Control file: Added Two control parameters: • (1) option to skip water pixels when making N-days composite, • (2) option to ignore scan error test so that Metop-B data at early stage (before formal operation) can be processed.

  17. Other improvement on VHP UseSatellite ID instead of satellite number when finding the input L1B files by “scdr-files” command Impact: This feature is designed for STAR scientists only. For OSPO, input L1B files should be available in a folder.

  18. Other improvement on VHP Using macro statement to make the source code simple, without impact on program execution. File: lib_basic.h //the following macro statements will check potential errors before execution, when error, print the error location andmessageandexit the program #define ADDSTRINGS(a,b,c) addString(__FUNCTION__,__FILE__,__LINE__,a,b,c) #define CHECK_DIVISOR(d) checkDivisor(__FUNCTION__,__FILE__,__LINE__,d) #define ALLOCATE(size) allocate(size, __FUNCTION__,__FILE__,__LINE__) #define ERROR_OPEN_FILE(file) failOpenFile_exit(__FUNCTION__,__FILE__,__LINE__,file) #define ERROR_EXIT(message,value) error_exit( __FUNCTION__,__FILE__,__LINE__,message,value) #define CHECK_NC_ERROR(e) check_NC_error( __FUNCTION__,__FILE__,__LINE__,e) For example: In the source codes of VHP package, “checkDivisor” will be replaced by “CHECK_DIVISOR” and the program works in the same way. Original statement: checkDivisor (__FUNCTION__,__FILE__,__LINE__, dLat); New statement: CHECK_DIVISOR(dLat); Although we remove the location of calling statement, “__FUNCTION__, __FILE__, __LINE__”, the macro function CHECK_DIVISOR will and automatically added them back so that detail messages on where error occurs will be printed out.  Impact: code will be more readable.

  19. Other improvement on VHP Resolution flag in file name: VHP_40S60N.G1200m.C07.M1.P2012046.S316.E322.hdf Impact: If resolution < 4km, it will be presented by meters.

More Related