Update on ATLAS insertable B-layer. LHCC Upgrade session CERN, September, 22 nd 2009 G. Darbo - INFN / Genova Indico agenda page: http://indico.cern.ch/conferenceDisplay.py?confId=67640. IBL Project Status. Project approved by ATLAS Project Leader endorsed by ATLAS CB (February 20 th )

Download Presentation

Update on ATLAS insertable B-layer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on ATLAS insertable B-layer LHCC Upgrade session CERN, September, 22nd 2009 G. Darbo - INFN / Genova Indico agenda page: http://indico.cern.ch/conferenceDisplay.py?confId=67640

  2. IBL Project Status • Project approved by ATLAS • Project Leader endorsed by ATLAS CB (February 20th) • IBL has put in place its management structure (Management Board) – members nominated • ATLAS Institutes Participation • IBL Kick-off (July 8th) meeting with Institute’s Leaders to focus participation in the project. • Large interest in the project (~35÷40 institutes participated at the kick-off meeting and have shown interest in parts of the project) • Project cost evaluated and funding model proposed: 4.0 MCH (M&O-A), 5.6 MCH (M&O-B, new project) • Technical Design Report (TDR) • Main editor / technical editor (K. Einsweiler / M. Capeans) and chapter editors in charge • Few editor’s meetings since end of July, TDR foreseen for April 2010. • Memorandum of Understanding foreseen in “interim” form by the end of the year: • MoU will be signed after TDR (spring 2010)

  3. IBL Organisation Structure • Membership • IBL Project Leader: G. Darbo • IBL Technical Coordinator: H. Pernegger • “Module” WG (2 Physicists): F. Hügging & M. Garcia-Sciveres • “Stave” WG (1 Phy. + 1 M.E.): O. Rohne + D. Giugni • “IBL Assembly & Installation” WG (2 M.E. initially, a Phy. Later): N. Hartman + R. Vuillermet • “Off-detector” WG (1 Phy. + 1 E.E.): T. Flick + S. Débieux • “Extra” members: • Ex officio: Upgrade Coordinator (N. Hessey), PO Chair (M. Nessi), Pixel PL (B. Di Girolamo), ID PL (P. Wells), Pixel Chair (C. Gößling) • Offline “liaison” Pixel Off-line coordinator: A. Andreazza • TDR editor (temporary): K. Einsweiler • Whole project divided into 4 working groups • IBL Management Board has 10 members, plus “extra” and ex-officio members. • Frequent meetings (every ~14 days) in this phase of the project. • IBL Management Board • Membership: • IBL PL + IBL TC • 2 coordinators from each WG • Plus “extra” members • Module WG • (2 coordinators) • FE-I4 • Sensors • Bump-Bonding • Modules • Test & QC • Irradiation • Stave WG • (1 Phys + 1 Eng.) • Staves • Cooling Design & Stave Thermal Management • HDI • Internal Services • Loaded Stave • Test & QC • IBL Integr.-Install. • (2 Eng.) • Stave Integration • Global Sup. • Beam Pipe (BP) • Ext.services inst. • IBL+BP Installation • Cooling Plant • Test & QC • Off-detector • (1 Phys + 1 E.Eng.) • Power • DCS • ROD • Opto-link • Ext.serv.design/proc. • Test Beam • System Test

  4. TDR - Schedule

  5. Sensor • To put here: • 3 sensor technologies to the prototype phase – decide end of 2010 • Progresses in the development – pick up from sLHC R&D efforts • How to converge – engineering set of specifications • Have ~3 slides on sensors

  6. FE-I4 • Put here: • Status • Submission review in November • 1 or 2 slides

  7. Stave Design • To put here • Layout (preferred) • Motivate the need of a small beam pipe: tight clearance, gaining 0.5 cm is large respect the available space between BL and present beam pipe, beam pipe bake-out need space for IBL safety (show thermal simulation), use an IBL PST to simplify insertion…. • Show developments: • Pipe, Thermal Management, Fittings, options • Goal to reduce material budget from 2.7 to 1.5 %X0 • ~2-3 slides

  8. Schedule • To put here • Plan to install in 2014, even if not sLHC phase I: • IBL as safety insurance for the present IBL • Cannot be much before without sacrificing performance, Need new technology development (Sensor, FE-I4, Staves) • From the machine: • Need to synchronize a long shutdown (8 months) for IBL installation – in the shadow of machine element installation • Motivation for an IBL and not a new Pixel (CMS) • New technology do not allow a large production scale (2 years more) • Make a replacement of the pixel detector with old technology difficult to find collaboration to make, and also would slow down technology improvement needed for sLHC • CMS is faster in opening and inserting/connecting the new Pixel system

  9. Some questions to the Machine • To put here (help from Marzio/Nigel) • Triplet optimisation will need a new TAS: what are the requirements? – what are the implications for the shielding? This could be a big impact on ATLAS! Implications for the forward muons • Smaller beam is needed for IB what are the implications of a larger TAS opening and a smaller beam-pipe (and IBL)? What are the concern for the IBL safety? • What else?