An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning DCS WS 13 - 14.3.06 L.Jirdén

  2. PC room ACR CR4 Pre-commissioning at P2 DCS network PC sensorsactuators TPC FE PC DSS FE PC FE PC Console PLC FE PC PC SG Console DCS Back-end CERN Backbone network App GW HMPID What sub-systems will you install?How many PC’s?What Back-end services and what support do you need from ACC? FE PC FE PC DB-SRV Disk SRV DC ACORDE FE PC CR3 FE PC sensorsactuators DSS MUON FE PC FE PC SXL2

  3. weeks D- 4 D- 2 D Hand-over COMM COMM COMM DCS PROJECT INST INST INST DETECTOR INST COMM TODAY Final installation Mar Apr May June NETWORKPC + BASE SYSTEM CONTROL CABLESAND DEVICES

  4. Detector installation

  5. Latest COMM COMM COMM INST INST INST TODAY Final installation:PHOS, TOF, TRD, HMPID, ACORDE 12 Jun 26 Jun 10 Jul Mar Apr May June Hand-over NETWORKPC + BASE SYSTEM CONTROL CABLESAND DEVICES DCS PROJECT DETECTOR INST COMM

  6. Gas Systems planning • CERN DT1/GS section is responsible for the construction of eight gas systems: TPC, TRD, TOF, HMPID, CPV, PMD, MuTracker, MuTrigger • All gas racks are planned to be installed by end May • Cable status: • Cables from SG to Plug and from Plug to UX are installed already. • Connectors still missing • Piping schedule: • SG to Plug : end APRIL • Plug to UX : END JULY • Commissioning and fine tuning from about May to September(depending on the progress of detector installation) S. Haider PH/DT1

  7. Project: ALICE DCS week • For whom • All detector DCS contacts and/or designers • Aim • To guide and assist the detector users to prepare their DCS applications and to assure the delivery of coherent projects in time. The aim is also to boost the Detector DCS work. • Program • Special ALICE DCS course/hands-on exercise • Framework tools & components recap • Alarm handling • Configuration Dbase 3 days • Access control • FSM introduction • ALICE DCS guidelines/standards/rules 1 day • Work on own detector applications 1 day • Pre-requisites • PVSS & Framework course • When • 24 – 28 April