1 / 8

FAST TRACK

FAST TRACK. tracking system Presentation. Acrobatics get in motion Artistes perform in front of big projection screens or float freely in the space over the heads of the audience. Live act and video projections blend together and have an effect of an exorbitant presentation.

zilya
Download Presentation

FAST TRACK

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FAST TRACK trackingsystem Presentation Acrobatics get in motion Artistes perform in front of big projection screens or float freely in the space over the heads of the audience. Live act and video projections blend together and have an effect of an exorbitant presentation. Fast Track is a vertical rail and sledge system and was developed by TEAM EXTREME, primarily for artistic performances. There are unlimited possibilities for the creation of new forms of expression by the artistes. The coordination of horizontal and vertical rides at different speeds is the basis for 2-dimensional movements. The artists float through space apparently with weightlessness and can be positioned at any imaginable point of a given level. 4 passive sledges with single rope technology, computer control

  2. FAST TRACK trackingsystem sledge SLEDGE Passive, filigree tracking system Horizontal and vertical movements up to 4m/sec. Respectively 2 highspeed winches are responsible for controling Drives are exactly programmable, 2-D software Artistes are performing in their flights Programmed, choreographed, dynamic arial images Almost soundless sledgerides

  3. FAST TRACK trackingsystem technicalspecifications Trussingtype - 50 x 50 cm 4-point traverse 1 raillineisneeded per artist According to theshowtherecanbemounted 2 raillines on 1 traverseline Length and distance of thesledges to eachotheris variable Thetrussingsystemmustbefixedagainstslinging Total inducedforces: Per pulley (diverterpulley/sleigh) at one point At horizontal und vertikal steelrope, Fh= weightforce + dynamic (artist 70kg (incl. ballast und costume) force incl. dyn ~ 1,5 kN, so Fh~1,5kN Fres ~ 2,1kN resultant Measurements of winches length 1345 mm, width 100 mm, height 905 mm weight 600 Kg / winch

  4. FAST TRACK trackingsystem technicalspecifications, setup Setup Position of winchesareusually on theground Theartist will befixedwith 2 ropes on his artisticbelt, left and right Expenditure of time 1-2 days theperiod of programmingisabout 8 hours Adjustment of light programming, about. 3-4 hours Cherry picker and forkliftisneeded

  5. FAST TRACK trackingsystem technicalspecifications, power Power400V three-phase current 50 Hz, with proper neutral and earth must be assured!1 or 2 125 A CEE plug next to the winches, fused 125A time lag, with no other power consumers on this fuses. It depends on number of winches. Generator If the power is provided by local generator its power capacity should be at least 120KVA, depends on the number of winches as well. No other power consumers on this generator as well.  R C D It is very important that there is no RCD or any other earth leakage protector of any kind in the whole power line! If any existing RCD is not detachable, there must be a transformer to get ground free. The transformer must be capable of 120 KVA, but depends on the number of winches. There are no other power consumers allowed after the RCD, even if the generator would be big enough. Any power failure is definitely serious and will end the show. Any power failure during set-up or rehearsals will cause considerable delay. In any case there will be no danger to artist or any participants.

  6. FAST TRACK trackingsystem operatorplace Operator place 1 desk / platform 1 x 2m, 2 chairs 220 V electricity 3 data cables will be installed between the winches and the operator location. outdoor Additional 1 Pavillion3 x 3 m with walls. At cold temperatures appropriate heating is necessary. It is very important, that at any time the operator has a free sight to the action area. Theactionarea and thespace of thewinches mustbeseparatedagainstanyaccess.

  7. FAST TRACK trackingsystem flights / performance • Flight of an artist on sledgesystem • LANXESS ARENA BAUMA MUNICH

  8. FAST TRACK trackingsystem technicalteam • Technicaldirector • Planningcreation of CAD 3D plans • Safe actionwhile show, setup and dismantling • Systemcontrol ( winches,rigging) • Computer-spcialists • Show programming and showoperator • Adjustment of theprogramming to variable conditions as: • Music, changingnumbers of artistes, different heights and formations • Production Manager • Entirecoordinationartist an technics • Responsibleforsafety of artists and showaction

More Related