1 / 3

Task HCD-08-03-01: LH4IT 4th Working Meeting 8-9 Feb 2010, Cadarache Agenda Monday 8th Feb

Task HCD-08-03-01: LH4IT 4th Working Meeting 8-9 Feb 2010, Cadarache Agenda Monday 8th Feb Building 506 room 105 with remote participation 9:00 - 12:30 Report on the progress of WG2 (Launcher) 4A+ 4P MJ : include 3dB hybrid junction with optimized bi-junctions, ENEA

ziya
Download Presentation

Task HCD-08-03-01: LH4IT 4th Working Meeting 8-9 Feb 2010, Cadarache Agenda Monday 8th Feb

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task HCD-08-03-01: LH4IT • 4th Working Meeting 8-9 Feb 2010, Cadarache • Agenda • Monday 8th Feb • Building 506 room 105 with remote participation • 9:00 - 12:30 • Report on the progress of WG2 (Launcher) • 4A+ 4P MJ : include 3dB hybrid junction with optimized bi-junctions, ENEA • MC: reassess the design of DDD2001 (output dimensions) ENEA/CEA • Windows: the design of primary and secondary windows • Window: consider Ti-Alloy for the frame of the ceramic, CEA/ENEA • Path of the reflectometer WGs from the antenna front to the back plate (WG2 & 4), CEA/ENEA • Provide documents with required geometrical data for first neutron cqlculation, ENEA • Provide the required data, CEA • First neutron analysis with neutron absorption profile, ENEA • Analysis of 8AWG-FAM 8 with plasma (RC, directivity , Electric field), CEA/ENEA • Optimize directivity of FAM by non uniform phasing, POLITO

  2. Tuesday 9th Feb: 9:00 - 12:30 Building 513 room 110, with remote participation 9:00 – 10:00 Report on the progress of WG1 (Modeling) Flux savings calculations for ramp-up + inductive scenarios calculations with 2 different models, CEA Estimation of Q for burning phases, CEA Baseline Hybrid scenario with the addition of 20 MW LHCD (using GLF23, 53 MW scenario vs 73 MW), CEA Ramp-up: repeat published simulations with C3PO/LUKE, use different transport models and spectrum assumption, CEA Linear damping of LH waves of fast alpha particles, CEA Domain of operation (B,n) with N//=2 ( also 1.8 and 2.2 ?)ENEA ENEA suite of code for scenario 4 at 14 MW of absorbed power with and w/o PDI effect 10:00 – 11:00 Report on the progress of WG3 (T-lines) Intermediary report Implementation of rectangular TLs, CEA Define the number of bends required for the TLs and optimize the bends, ENEA Optimization of the slot parameters for mode filters, ENEA, RomaIII Investigation of techniques to avoid degenerate modes, ENEA, RomaIII

  3. 11:00- 12:00 Report on the progress of WG4 (Diagnostics) and WG5 (Power Supply) Intermediary report Path of the reflectometer WGs from the antenna front to the back plate (WG2 & 4), CEA/ENEA 12:00 – 12:15 Discussion on publications, participation in Conference (SOFT, IAEA, etc...) 12:15- 14:00 Lunch 14:00- 18:00w/o remote participation Preparation of the CCLH presentation

More Related