1 / 11

EVLA Siting Logistics

EVLA Siting Logistics. Sean Dougherty, HIA Chris Langley, NRAO.

zizi
Download Presentation

EVLA Siting Logistics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EVLA Siting Logistics Sean Dougherty, HIA Chris Langley, NRAO DVA1 Meeting at NSF

  2. The following discussion will examine the site challenges associated with testing a 15 meter (or to a lesser extent, 12m).The EVLA site has been discussed as a strong candidate for these tests.Involvement of the NRAO in the DVA1 project is presently being negotiated. DVA1 Meeting at NSF

  3. Siting Concerns • Antenna Fabrication Building • Antenna Pads / Interconnections • Existing Key Subsystems • Available Technical Support • Safety • Visitor-friendly Location DVA1 Meeting at NSF

  4. Antenna Fabrication Building • Dish cannot be manufactured in the open air • Dish mold (heavy) requires a concrete floor • Controlled air temperature required • Safe mold storage temperature is 5 ⁰C to 35 ⁰C, with minimal fluctuation • Resin infusion may occur between 15 ⁰C and 35 ⁰C • Clean environment required • Space required to manufacture a 15m X 18m dish1 • 55m L X 22m H X 10m ceiling apex, TBC • 19m L X 10m H opening • Fully outfitted • Lights, floor, HVAC, ventilation, work and storage, … [1] R. Hellyer, “Composite Applications for Radio Telescopes (CART): Portable Factory for Fabrication of Composite Dishes,” NRC-CART Memo #0026, December 24, 2009. DVA1 Meeting at NSF

  5. Antenna Fabrication Building • Cost to provide a suitable building could besignificant (~ $500K) • Existing EVLA structures • Do not fulfill basic requirements • Are unavailable due to EVLA construction schedule • Is a building capable of housing full production necessary at this time? [1] R. Hellyer, “Composite Applications for Radio Telescopes (CART): Portable Factory for Fabrication of Composite Dishes,” NRC-CART Memo #0026, December 24, 2009. DVA1 Meeting at NSF

  6. Antenna Pads / Interconnections • Seventy-two available EVLA pads • 12 Core SMF cable • 2 ethernet, 2 LO, 1 Data Transmission, 7 spares • 208 Vac 3 Ø, 60 Hz, 160 A/Ø • Antenna may occupy different locations • One available ALMA Test Facility pad • SM Corning Freedom 12 fibers • 208 Vac3 phase, 60 Hz, 250 A/Ø & 400 Vac 3 Ø, 200 A/Ø • Does not allow for multiple DVA1 locations • Requires limited re-work • DVA1 will require a metal frame adapter regardless of pad type DVA1 Meeting at NSF

  7. EVLA Pad Fiber Interface Pad Box – houses 12 terminated fibers Each Antenna travels with its own umbilical cord. DVA1 Meeting at NSF

  8. Existing Key Subsystems • Slots are available in WIDAR correlator for data receiver cards. • LO signals are available at all pads. • Monitor and Control System may be expanded to accommodate DVA1. DVA1 Meeting at NSF

  9. Available Support • Machine shop • Cryogenics group • HVAC expertise • Heavy lifting equipment & operators • Additional local expertise DVA1 Meeting at NSF

  10. Safety • EVLA Safety Officer present on site • Established safety procedures • Safety equipment available DVA1 Meeting at NSF

  11. Visitor-friendly Location • NRAO Guest House along with ample hotel rooms in Socorro • Restaurants and shopping in area • Tourist venues in the immediate area • Daily scheduled shuttles to/from the site DVA1 Meeting at NSF

More Related