1 / 15

RTCA Display for Increased Situational Awareness

RTCA Display for Increased Situational Awareness. Presented by Cory Fisher September 2015. Agenda. SRP System Model SRP Real Time Sequence (RTS) Current Operator Control Page New Operator Control Page (New Features) Examples (Illustrations of New Control Page) Current Status Questions.

zlata
Download Presentation

RTCA Display for Increased Situational Awareness

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RTCA Display for Increased Situational Awareness Presented by Cory Fisher September 2015

  2. Agenda • SRP System Model • SRP Real Time Sequence (RTS) • Current Operator Control Page • New Operator Control Page (New Features) • Examples (Illustrations of New Control Page) • Current Status • Questions

  3. SRP System Model • EMS Model - 2200 BUSES • Voltage Levels - 500kV down to the 12kV Level • Neighbors • Arizona Public Service Company (APS) • Western Area Power Administration (WAPA) • Tucson Electric Company (TEP) • Full Arizona footprint (BES) with some lower voltage parallel Neighboring Systems (APS) • Network Model reaches several Buses into… • South California • Nevada • Utah • Colorado • New Mexico

  4. SRP REAL TIME SEQUENCE (RTS) • RTS Cycles Every 6 seconds. • State Estimator Runs every 30 seconds • Real-Time-Contingency Analysis runs every 5 minutes • Total of 850 Contingencies (and growing) • All SRP 69kV to 500kV (N-1) • Creditable BES (N-N) • Neighbor’s BES • Open-End Line Contingencies (Closing Angle Exceedances)

  5. Current Control Page • All Results from RTCA for both SRP and Non SRP Contingency are displayed on the same page. • No way to sort between SRP and Non SRP exceedances. • No way to sort between (N-1) and (N-N) exceedances. • Results sorted by severity resulting in all the (N-N) contingency dominating the page.

  6. New Operator Control Page New Features • Contingency Categories for: (N-1) and (N-N) • SRP Contingencies/SRP Exceedances. • Foreign Contingencies/SRP Exceedances. • SRP Contingencies/Foreign Exceedances. • Foreign Contingencies/Foreign Exceedances. • Open-Ended Line Contingencies • Load Drop Contingencies

  7. New Operator Control PageNew Features(Continued) • Power-Flow Solutions Quality Indices. • Up And Down Arrows (Indication more items below or above) • Minutes since last CA Run (successful run)

  8. New Operator Control PageStatus • Currently running in Production in parallel with the Old Page. • All Shifts have received training on the New Page. • Old Page will be turned off by the end of the Month (September).

  9. Questions?

More Related