An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work System 5 Enabling BPS with IT Support

  2. IT Support Processes: Wave I • 5.1.1 Manage Technology Resources Delivery • 5.1.2 Ensure Effective Utilization of Technology • 5.1.3 Data Management

  3. Effective Utilization: The Sum of Sub-Processes • 5.1.2 Ensure Effective Utilization of Technology • 5.1.2.1 Edline Implementation Process • 5.1.2.2 ETGP Process • 5.1.2.3 BETC Process • 5.1.2.4 EETT Process • 5.1.2.5 Recognition Process (ATTAIN) • 5.1.2.6 Technology Planning Process • 5.1.2.7 Sunrise Standard Training Process • 5.1.2.7.1 Videoconferencing Program • 5.1.2.7.2 Easiteach • 5.1.2.7.3 Discovery Streaming • Etc…

  4. Define: Organizational Linkage • School Board Priority Objective (2007) • “Parents will have the ability to monitor student grades, homework and attendance via the Internet.” • Strategic Plan Objective (2011) • “Every teacher in every school will utilize Edline by the beginning of the 2010-2011 school year.”

  5. Theme Statement The quality, quantity and consistency of professional development will continually improve causing the percent of teachers actively engaged in Edline to increase.

  6. P1: # Teachers Trained P2: % Teachers Ready to Implement Q1: % Teachers Satisfied Q2: # Parents Satisfied Q3: % Teachers Utilizing Q4: # Parents Utilizing Ensure Effective Utilization of Edline Develop Training Deliver Training Effective? N Y Monitor Implementation Provide Ongoing Support N Evaluate (Surveys and Reports) Effective? Y Ensured Effective Utilization of Edline

  7. Measure • Potential Problem Areas • Training does not meet the needs of teachers (P2) • Not all teachers are able to access training (P1) • Problem Statement • Last year, only 82% of 1526 teachers participating in Edline training felt as though they could successfully implement the program. As our target is 100%, there exists a significant opportunity for improvement--an 18% gap.

  8. P2: Teachers Ready to Implement • 2007-2008 • 83% • 2008-2009 • 92% GAP

  9. P1: Number Trained • 2007-2008 • 1526 Trained • 2008-2009 • 1295 Trained • Cumulative • 2821 Trained GAP

  10. Analyze • Potential causes of selected problem from “Measure” step • Time • Support • Conflicting Interests

  11. Analysis

  12. Improve

  13. Control Work the Process!

  14. Outcome Measures GAP

  15. Outcome Measures GAP

  16. Outcome Measures GAP

  17. Next Steps • Promote Alternative Training Ops • Dig Deeper into FRL Gaps • 0-10% Free and Reduced:  93%  (West Shore with 6% FRL) • 11-25% Free and Reduced:  84%  (Jefferson with 24% FRL) • 26-50% Free and Reduced:  53%  (Stone with 50% FRL) • 51-60% Free and Reduced:  44%  (Coquina with 59% FRL) • 61-75% Free and Reduced:  22%  (Palm Bay Elem. with 65% FRL) • 76-100% Free and Reduced:  5%  (Cambridge with 86% FRL) • Develop Better Utilization Reports