An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Georgian National Energy and Water Regulatory CommissionGNERC Bucharest Workshop 18-20 May, 2008

  2. Valuation of AssetsBasic Principle – Original Cost Less Accumulated Depreciation • Privatisation of Distribution Networks and six HPPs (2007). Cost of assests was equal to that of under original cost less accumulated depreciation • Assets used in non-regulated activities are not considered in tariff calculations

  3. Treatment of O&M CostsActivities Provided Outside the Utility • Only the costs that are necessary to carry out regulated activities are treated in tariffs • Costs should incurr at reasonable (acceptable) prices

  4. Allocation of Costs Between Regulated and Non-regulated Activities • List of costs related to regulated activities is defined in the methodology of setting tariffs • According to The Law the Licensees are required to keep separate accounting of costs and revenues for regulated and non-regulated actitivies.

  5. Disallowable Costs in Setting Tariffs • Only the costs necessary for carrying out regulated activities are subject to inclusion in tariff calculation • All other costs remain as disallowable

  6. New Construction Investors start to recovery the costs for new constructions only after the plant is put into service • Supply Cost Different sources of supply bear different costs High volatility is forcastable to some extent

  7. Thank You