110 likes | 236 Views
New Radon Resistant Construction & Mitigation National Tribal Forum-2012. Vivian Craig, Sr. Environmental Specialist NNEPA Radon Program. New Radon Resistant Construction. Building the framework - Should we be concerned about Radon-YES.
E N D
New Radon Resistant Construction & Mitigation National Tribal Forum-2012 Vivian Craig, Sr. Environmental Specialist NNEPA Radon Program
New Radon Resistant Construction Building the framework - Should we be concerned about Radon-YES.
Building the Framework to conduct a radon mitigation workshop • NNEPA Radon Program has to follow the following: • NN Procurement Policy process. • Regional Business Development Office (RBDO) • Source List • Sole Source List
Building the Framework to conduct a radon mitigation workshop • Section 164 Review Process • Department & Phone No. • Document • Brief description of attachments • Reviewers • Sponsor/Program Signature • Division Director Signature • Office of Management & Budget • Office of Attorney General • Office of the President • Legislative Counsel • Committee Chairperson • Back to O.M.B. for Administrative Implementation • Business Regulatory Dept. • Comments Section Signature Approval Sheet (SAS)
Building the Framework to conduct a radon mitigation workshop • The Instructor • Mr. Brad Turk • Environmental Bldg. Sciences, Inc. • Las Vegas, NM • Exceptional skills: • As an Instructor • People skills • Highly recommended • Workshop scheduled for August 2012
Building the Framework to conduct a radon mitigation workshop • Occupant on fixed income • No access to the crawlspace. • Install a Solar Panel to run the one fan 6 inch radon fan • Crawlspace 8 to 14 inches • No electricity at time of selection
Building the Framework to conduct a radon mitigation workshop • Perfect home for radon mitigation. • Committed Homeowner • Crawlspace @ 3-4ft. • Clean crawlspace • Solid foundation no cracks along the joints • Access to crawlspace • Install one 6 inch radon fan
Contaminated Structures Project Updates Hogan with dirt floor, no utilities and water After includes Electricity, Water and Septic System.
Contaminated Structures Project Updates Before with one bedroom including utilities After three bedroom w/all utilities, water and septic system After Before
Contaminated Structures Project Updates 6 bedroom w/utilities, water and septic system. 6 bedroom-3 bath (1 ADA) w/utilities, water and septic system.