An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How to increase the oil recovery in GFS Statfjord ? Forslag til Gullfakslandsbyen

  2. Gullfaks Sør Statfjord Formation PDO 1995: Large volumes in the Statfjord fm. Main reservoir in the Gullfaks Sat. 7 wells 2000 Sm3/d. 1999: F-4 T3H and G-2 T3H in production. Produced much less than expected. Statfjord Fm. on hold. 2001: G-3 T2H in production. Behave in accordance to new expectations. Unexpected gas breakthrough. 2002/2003: IOR project initiated. Identified problems: Limited reservoir communication Gas limitation

  3. DIACS and MLT F-4 and G-2 drilled G-3 drilled Development of GFS Statfjord reserves

  4. GFS Statfjord Challenge: • Complex reservoir with low recovery, goal +18% (LTP 2003-2008) • PDO – 12.6 MSm3. Today 5.1 MSm3 Wells drilled • Additional perforation of G-2 H and F-4 H in lower Statfjord (summer 2003) • G –1 H with DIACS (2003), periodically shut in. • G –2 YH MLT with DIACS (2004) • F –2 YH MLT with DIACS (2004) • G-3 Y3H, 3 branch MLT with DIACS (2005), SHUT in • GI MLT with DIACS (2006), only one branch injecting

  5. Could look into: Well solutions Technological solutions Drilling has so far been challenging. Simple or complex wells ? Wells spacing ? Increase of gas injection, number of GI ? Uncertainties in reserve estimates When start blowdown ? Economic considerations Economic development No economic limitations, KPI: recovery How can we increase the recovery ?

  6. Reflections could be made around • What should be used as a KPI ? • Recovery vs. NPV • Who makes the decisions? • Petroleum law, partners influence • Prioritarisation of gas injection or gas export ? • (high gas price: more economic to sell gas than inject in marginal oil reservoir) • Subsea • rig availability a challenge • rig costs increasing • Simulation model provided, already implemented at NTNU, 2006_students