310 likes | 501 Views
Building Your Head-End. with Bentley Inside Plant Module. Jerry Redmond. Director of Cable Operations Precision Valley Communications of VT, LLC. Mark Houghton. Cad Manager Precision Valley Communications of VT, LLC. Precision Valley Communications. 1988 19 years 65
E N D
Building Your Head-End with Bentley Inside Plant Module
Jerry Redmond Director of Cable Operations Precision Valley Communications of VT, LLC
Mark Houghton Cad Manager Precision Valley Communications of VT, LLC
Precision Valley Communications 1988 19 years 65 Springfield Vermont 9078
Measurements Take Room Measurements Width Height Length
Measurements (continued) Take Measurements of Units on Floor Width Height Depth
Measurements (continued) Take Location Measurements
Build Floor Plan Using the Bentley - Inside Plant Module Create the building layout
Building Racks Create all racks that have different measurements Create any additional units that require floor space
Placement Using the Bentley - Inside Plant Module Place all components in their dimensional spot within the floor plan
Creating Rack Equipment Using the Bentley - Inside Plant Module
Elevation Views Front Side Back Side Single Rack Multiple Racks
Connectivity Documentation Inside to Outside Connections Inside to Inside Connections
Reports Bill of Materials Connection Report Patch Report Patch to Patch Report Wire Run Detail Report
Reports Rack Elevation Report Schematic Detail Report Circuit Trace Report Services Report
Summary Floor Plan Rack Creation Rack Placement Module Creation
SummaryModule Placement Generate Reports Connect Inside to Inside Connect Inside to Outside