20 likes | 109 Views
Station assembly. 10 stations polished; enough for cosmic ray test Polishing quality is as good as that of station 5 scratchy Used new diamond fly cutter, no further investigation will follow at the moment
E N D
Station assembly • 10 stations polished; enough for cosmic ray test • Polishing quality is as good as that of station 5 scratchy • Used new diamond fly cutter, no further investigation will follow at the moment • 1 station used old design carbon fibre frame Need to be modified before use (station 8) • Polished stations/connectors to be cleaned • Dead channel in active region will be checked by UV-LED, hands and eyes first screening • Three more carbon fibres to be machined • Two for assembly, one as a jig for station 8 • All the bundling/connectorising of 15 stations will be finished by end of July • Gluing to carbon fibre frame will follow as soon as they are ready
Station assembly status • station bundling connectorising gluing polishing ========================================================= • 5 done done done done • 6 done done done done • 7 done done done done • 8 done done done done • 9 done done done done • 10 done done done done • 11 done done done done • 12 done done done done • 13 done done done done • 14 done done done done • 15 done done done - • 16 done done done - • 17 done done done - • 18 ongoing ongoing - - • 19 - - - -