An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Combined Heat & Power Plant Group Meeting # 2 Mentor: Shannon Brown, PE Michael Bentel Jeremy David Erik Peterson Arpit Shah

  2. Questions from Group Meeting #1 • What are the specifications for fuel? • ~80 – 85% - C2+ • ~ 10% - CH4 • ~ 5 % - N2 • ~ 2 % - CO2 • What is the primary heat source for the boiler? • Combustion gases from Gas Turbine along with Natural Gas • Boiler – Heat Recovery Steam Generator (H.R.S.G.) • What is the cheapest source of fuel for this plant? • Waste hydrocarbons from **Team Alpha**

  3. Questions (Cont’d) • What is the minimum water purity required for boiler feed water (BFW)? • Dissolved O2: < 0.007 ppm • Total Fe: < 0.01 ppm • Total Cu: <0.01 ppm • Total Hardness: 0.05 • pH: 8.8-9.6 • Silica: <2.00 ppm • Conduction < 150 • Total Dissolved Solids (TDS): 0.1 • How is the effluent stream from the boiler being addressed? • The Effluent stream will be sent through the flue gas purification system

  4. Group Meeting 2 Objectives • Flow Sheets • Material & Energy Balances • Process Flow Sheet Frozen • Data • Hand Calculations • Rough Economics

  5. Outline • Design Basis √ • Block Flow Diagram √ • Process Flow Diagram  IN PROGRESS • Material and Energy Balance  IN PROGRESS • Calculations  IN PROGRESS • Annotated Equipment List (Data Sheet)  IN PROGRESS • Economic Evaluation factored from Equipment Costs • Utilities • Conceptual Control Scheme • General Arrangement – Major Equipment Layout • Distribution and End-use Issues Review • Constraints Review • Applicable Standards  IN PROGRESS • Project Communications File  IN PROGRESS • Information Sources and References  IN PROGRESS

  6. Pumps and Compressors • As stated before, compressor is going to be used to provide plant air • Because instrument air must be very dry to avoid plugging and corrosion, a rotary screw oil free air compressor is commonly put through a dryer

  7. Air Compressor Material Balance H2O (cfm) Oil - Free AirCompressor P1 , T1 Wet (cfm) P2, T2, Wet (cfm) Refrigerated Air Dryer Dry (cfm)

  8. Compressed Air – Energy Balances • Dryer Mass Balance • ft3* 1 lb DA/ ft3* lb H2O/ lb DA = lbH2O * ft3/lb= cfm H2O • Work Done in Compressed Air • -W=P1ν1(n/(n-1))[(P2/P1) (n-1)/n-1] =ZRT(n/(n-1))[(P2/P1) (n-1)/n-1] • Heat of Compression: T2=T1(P2/P1)(n-1/n) 8

  9. One of the most expensive sources of energy of plant 10% of electricity consumption goes to compressed air generation Several compressors may be installed for maintenance purposes as a stand-by spare Compressor Costs Annual Electricity Cost =

  10. Williston, ND - Data • Dry Bulb Temperature : 92°F • Wet Bulb Temperature: 66°F • Highest Relative Humidity: 90%

  11. Induced – Draft Cooling Tower PFD

  12. Cooling Tower – General Material Balance Dry Air Mass Balance ṁa1 = ṁa2 = ṁa WaterMass Balance ṁhw + ṁa1∙ω1 = ṁcw + ṁa2∙ω2 = ṁhw-ṁcw = ṁa(ω2-ω1) Also, ṁMU = ṁa(ω2- ω1) + ṁBD

  13. Cooling Tower – Energy Balance Ėin– Ėout = ΔĖsys ΔĖsys = 0 0 = (ṁa2∙ha2) + (ṁcw∙hcw) – (ṁa1∙ha1) – (ṁhw∙hhw) ṁa = **Assuming Steady State and Adiabatic System**

  14. Data Used to Calculate M&E Balance

  15. Results from M&E Balance - ECT **Calculated at 11.8 psi

  16. Turbine & Boiler System

  17. Results from Boiler Material Balance *Based on ideal system (100% efficiency/recovery, no lose of water/steam due to system leakage)

  18. Results from Boiler Energy Balance Superheated *Calculated using steam tables and superheated steam tables for latent heat and superheated work, respectively; averaged heat capacity over temperature ranges for sensible heat; PV work for compression.

  19. Flue Gas Clean Up • Particle Removal • Gaseous Contaminates Removal • Wet Scrubber – Utilizes water for removal • Wet-Dry Scrubber – Utilizes aqueous spray for removal • Dry Scrubber – Utilizes dry powder for removal • Nitrogen Oxide Removal – Utilizes catalysis for removal • Stack – Measures contaminates in out flowing combustion gases

  20. USEPA & NDEPA Flue Gas Requirements • NOx: 100 ppb, averaged over one hour • SOx: 1 - hour standard at a level of 75 parts per billion  • CO: 8 - hour primary standard at 9 parts per million (ppm) 

  21. Turbine Material Balance • Gas Turbine Airin+ Fuelin= Exhaust Gasout mAir + mfuel = mExhaust • Steam Turbine High Pressure Steamin= Process Steamout + Condensing Steamout mHigh-P = mProcess + mcondensed

  22. Turbine Energy Balance • Gas Turbine Combustion Gasin = Workout + Exhaust Gasout (m*H)Combustion = (effturbine*(m*H)Combustion+ ((m*H)Combustion - effturbine*(m*H)Combustion)) • Steam Turbine High Pressure Steamin = Process Steamout+ Condensing Steamout + Workout (m*H)high P. = Σ(m*H)process + (m*H)condensed + effturbine*(Σ((m*H)high P – (m*H)process) + ((m*H)high P. – (m*H)condensed))

  23. Relating Turbine and BoilerEnergy & Material Balance • Energy - Combustion Gasin – Workout = Exhaust Gasout = Exhaust Gasin= Steamout + Exhaust Gasout – Feed Waterin • Material – Airin + Fuelin = Exhaust Gasout = Exhaust Gasin = Steamout + Exhaust Gasout – Feed Waterin

  24. Results from M&E Balance – Gas Turbine

  25. Equipment List

  26. CHP - Rough Economics Where, • Ce= Purchased Equipment Cost • a & b = Cost Constants • S = Size Parameter • n = Exponent for that type of equipment **All equipment costs are based on U.S. Gulf Coast Basis, Jan 2010 (CEPCI index = 532.9)**

  27. Equipment Cost Table **Calculated Using Cost Estimation Equation in “Chemical Engineering Design”, Towler **Calculated Using “Plant Design and Economics for Chemical Engineers” Online Simulator, 5th Edition **Estimated Cost from GE

  28. Equipment Cost

  29. Economics – Cont’d • Total Equipment Cost: $27,032,416 • Total Cost of Installation: $117,861,333 *Assumption: 4.36*(Cost of Equipment) • Total Cost of Engineering: $8,109,724 *Assumption: Engineering costs = 0.30(Cost of Equipment) Total Cost = Cost of Equipment + Installation + Engineering = $153,003,474

  30. QUESTIONS???