1 / 12

How do we convert this into a resource?

How do we convert this into a resource?. Is this really the best the we can do with R200million?. Biogas to Electricity. Biogas powered vehicles, Sweden. 5.3 Million Natural Gas Vehicles (NGVs). In 2005 there were over 140,000 buses, 100,000 trucks, 5,100,000 cars. Solution:.

zuwena
Download Presentation

How do we convert this into a resource?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How do we convert this into a resource?

  2. Is this really the best the we can do with R200million?

  3. Biogas to Electricity

  4. Biogas powered vehicles, Sweden

  5. 5.3 Million Natural Gas Vehicles (NGVs) In 2005 there were over 140,000 buses, 100,000 trucks, 5,100,000 cars

  6. Solution: Public Transport Heat Scrubber Biomethane Process Water Waste water Industry Biogas Anaerobic Digestion High Rate Algae Oxidation Ponds OFMSW Digested sludge Organic fertilizer Bioprocess Plant for the extraction of oils, biodiesel, nutracueticals, metabolites & ß-carotene Garden refuse Compost Tree Nursery & potting soil Sweet sorghum & biofuel crops Horticulture and nursery

  7. 2Ml/day waste activated sludge diverted from pipeline to hoodpoint marine outfall pipe, 800m of 160mm pipe no additional pumping 8Ml/day existing flows 2nd creek WW pump station, eliminate requirment for 220kW pump set 10Ml/day wastewater diverted from hoodpoint marine outfall pipe requirements 4km of 160mm pipe & 150kW pumpset

  8. Garden Refuse 30 000 tons per year or biomass resource going to waste

  9. Garden refuse East London Generates 30000 tons per year (82.2 tons per day) of garden refuse at four Garden Refuse Transfer Stations (GRTS) which get transported to Roundhill Landfill. • Divert 15% (4500 tons/a) of grass & fresh leafy fraction to biogas digester • Divert 40% (12144 tons/a) of the mixed woody and leafy waste to co composting with digester sludge. • Divert 45% (13356 tons/a) of the woody biomass to a 1.35MWe & 2.1 MWth gasifier CHP

  10. Closing the Rural and Urban Loop in a Zero Waste Economy Job creation, food security, energy & fuel security, environmental protection,and nutrient beneficiation

More Related