200 likes | 316 Views
Kissimmee River Restoration Contract 13B. Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By Greg Kennedy. Bypass Flow Way now drying due to flow returning to the Historic and newly excavated Kissimmee Channel. Spoil Mound B North.
E N D
Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By Greg Kennedy
Bypass Flow Way now drying due to flow returning to the Historic and newly excavated Kissimmee Channel Spoil Mound B North C-38 Northern Extent of C-38 Backfill for the 13-B Contract
Northern Extent of C-38 Backfill for the 13-B Contract Culvert Crossing Washed Out During Initial Flows to the Restored Oxbows Direction of Flow
Restored Section of the Oxbow Spoil Mound B North C-38 To Be Filled
Bypass Flow Way Backfilled C-38 Restored Oxbow Spoil Mound B North
C-38 To Be Backfilled Drying Bypass Flow Way Backfilled C-38 Restored Oxbow
C-38 To Be Backfilled Spoil Mound B South Restored Oxbow
Spoil mound B South Bypass Flow Way C-38 To Be Backfilled Restored Oxbow
Spoil Mound B South Bypass Flow Way Restored Oxbows
Spoil Mound B South Partially Filled C-38 Restored Oxbows
Drying Bypass Flow Way Plugged C-38 Partially Filled C-38 Restored Oxbow
Partially Filled C-38 Degraded Portion of Spoil Mound B South Dredging of Historic Oxbow
Turbidity Generated from the Cutter Head on the Dredge Note: The Plume Moving Up River Indicating an Absence of Flow Historic River Channel Being Dredged to Design Depth
Partially Filled C-38 All oxbows visible in this photograph were excavated from former Kissimmee River Marsh
Partially Filled C-38 Newly Excavated Oxbows
Substantially Filled C-38 Newly Created Oxbows
Southern Limit of Contract 13B and Northern Limit of Contract 13A Oxbow Excavated as Part of Contract 13A Filled C-38 Limit of Newly Excavated Oxbows as part of Contract 13B