100 likes | 270 Views
OFFLINE Meeting. LNF-1-Feb-06. Results from MC05 pre-production (discussion); Energy vs Y correction in endcap: P. Gauzzi; Insertion of background in MC: M. Palutan; Trigger simulation for 2004-05: B. Sciascia ; 2005 data quality: G. Venanzoni;
E N D
OFFLINE Meeting LNF-1-Feb-06 • Results from MC05 pre-production (discussion); • Energy vs Y correction in endcap: P. Gauzzi; • Insertion of background in MC: M. Palutan; • Trigger simulation for 2004-05: B. Sciascia ; • 2005 data quality: G. Venanzoni; • Background parametrization of the K+- events: P. De Simone • DEDX calibration on MC: R. Versaci; • New IBM machines: P. Santangelo; • Test and optimization of data handling system: F. Sborzacchi
In addition, Insert in Geanfi: • hppee (C.Gatti/R.Versaci) • “correct” Ksppee (C.Gatti) • e+ e-wp0p+p- p0 p0 (A. De Santis)
Cluster efficiency with MC’05 (S. Giovannella) fhg p0p0p0g
EMC Time resolution with MC’05 (C. Gatti) • a fixed to MC value of 2002 (61 for barrel, 63 EC) when fit data • Barrel: • b = 93 c = 53 (DATA ’04, second period >30300) • b = 74 c = 76 (MC 05) • b = 0 c = 127 (MC 02) • Endcap: • b = 109 c = 45 (DATA ‘04) • b = 63 c = 106 (MC 05) • b = 13 c = 122 (MC 02) MC Statistics is low!
EMC Time resolution with MC’05 (C. Gatti) fp+p-p0 Barrel
EMC Time resolution with MC’05 (C. Gatti) fp+p-p0 End-Cap
MC05 possible time schedule • 2 weeks to fix bugs/corrections, insertions of trigger thresholds, new generator in Geanfi, etc… • Feb 15: start 100 pb-1 all_phys (LSF = 0.2): run range?