1 / 10

OFFLINE Meeting

OFFLINE Meeting. LNF-1-Feb-06. Results from MC05 pre-production (discussion); Energy vs Y correction in endcap: P. Gauzzi; Insertion of background in MC: M. Palutan; Trigger simulation for 2004-05: B. Sciascia ; 2005 data quality: G. Venanzoni;

zwi
Download Presentation

OFFLINE Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OFFLINE Meeting LNF-1-Feb-06 • Results from MC05 pre-production (discussion); • Energy vs Y correction in endcap: P. Gauzzi; • Insertion of background in MC: M. Palutan; • Trigger simulation for 2004-05: B. Sciascia ; • 2005 data quality: G. Venanzoni; • Background parametrization of the K+- events: P. De Simone • DEDX calibration on MC: R. Versaci; • New IBM machines: P. Santangelo; • Test and optimization of data handling system: F. Sborzacchi

  2. In addition, Insert in Geanfi: • hppee (C.Gatti/R.Versaci) • “correct” Ksppee (C.Gatti) • e+ e-wp0p+p- p0 p0 (A. De Santis)

  3. Cluster efficiency with MC’05 (S. Giovannella) fhg p0p0p0g

  4. EMC Time resolution with MC’05 (C. Gatti) • a fixed to MC value of 2002 (61 for barrel, 63 EC) when fit data • Barrel: • b = 93 c = 53 (DATA ’04, second period >30300) • b = 74 c = 76 (MC 05) • b = 0 c = 127 (MC 02) • Endcap: • b = 109 c = 45 (DATA ‘04) • b = 63 c = 106 (MC 05) • b = 13 c = 122 (MC 02) MC Statistics is low!

  5. EMC Time resolution with MC’05 (C. Gatti) fp+p-p0 Barrel

  6. EMC Time resolution with MC’05 (C. Gatti) fp+p-p0 End-Cap

  7. MC05 possible time schedule • 2 weeks to fix bugs/corrections, insertions of trigger thresholds, new generator in Geanfi, etc… • Feb 15: start 100 pb-1 all_phys (LSF = 0.2): run range?

More Related