1 / 12

Wind Turbine Installation On Site Auto Generation

Wind Turbine Installation On Site Auto Generation. Presented by Dave Fleming BE MIEI Senior Electrical Engineer – RPS, Engineering Services. Why Auto Production?. Fits seamlessly into existing infrastructure without compromising electrical supply Energy Saving – approx €0.14 per kWh

Download Presentation

Wind Turbine Installation On Site Auto Generation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wind Turbine Installation On Site Auto Generation Presented by Dave Fleming BE MIEI Senior Electrical Engineer – RPS, Engineering Services

  2. Why Auto Production? Fits seamlessly into existing infrastructure without compromising electrical supply Energy Saving – approx €0.14 per kWh Improves Competitiveness Reduces Carbon footprint High profile PR SEI support grants Use of unproductive land

  3. Illustrative Wind Map

  4. Why Install a Wind Turbine? Economic Analysis Large Turbine

  5. Why Install a Wind Turbine? Economic Analysis Medium Turbine

  6. Why Install a Wind Turbine? Economic Analysis Small Turbine

  7. Why Install a Wind Turbine? Environmental benefit • One 2MW Wind Turbine operating @ 28% utilisation factor will generate 4.9MWh P.A. • 4.9 MWh generated by Coal / Peat / Gas (i.e. traditional • possible funds) would produce approx. 4,000 Tons of CO2 per annum. • Reduced Carbon emissions/ • Possible Carbon Credits

  8. Wind Turbine Development Process • Pre Feasibility SEI Grants available • Front End Study • Planning Application / EIA • Detailed design – Electrical & Civil • Procurement of Turbine and Auxillary Equipment • Construction • Commissioning and Handover • Maintenance

  9. Pre- Feasibility Deliverables • Preliminary wind analysis using wind maps • Assessment of site load profile • Preliminary Turbine selection • Preliminary cost / benefit analysis • Initial planning consultation • Road Access for Maintenance • Heritage Study • Maintenance Requirements

  10. Front End Study - Deliverables • Met mast installation and data collection • Wind yield analysis • Turbine selection • Project Economic Modeling - +/- 10% cost estimate • Preliminary Design (Electrical, Civil / Structural)  • Planning Considerations / Consultations • Stakeholder services • Planning Application • Environmental Impact Assessment • Photo Montage Further Requirements

  11. Potential Project Issues • Visual Impact • Light Flicker • Noise • Aviation issues • TV Signal Disruption • Community Obstructions • Environmental Impact Assessment Measures to negate these concerns • Engage with Planning Authority • Stakeholder Inclusion • Communicate with Community

  12. Thank You Dave Fleming - Senior Electrical Engineer Dave.fleming@rpsgroup.com Telephone 021 4804656

More Related