An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Baltimore Red Line: Challenges of a Large Model Area Presented by: Mahmood Shehata, P.E. McCormick Taylor, Inc. Philadelphia, PA Presented to: PTV Users Group Meeting May 16, 2008 Philadelphia, PA

  2. Presentation Topics • Introduction to Baltimore Red Line • Work Sharing and Modeling Standards • Downtown Base Model Development • Model Calibration Techniques and Obstacles • Coding of Alternatives – Including TFlow Fuzzy • Lessons Learned

  3. Introduction to Baltimore Red Line

  4. Introduction to Red Line • 12-mile East-West Corridor • Western Suburbs through Downtown Baltimore to Eastern End of Baltimore City • Potential BRT or LRT Corridor • Alternatives Analysis for DEIS and New Starts

  5. Red Line Corridor

  6. Existing Transit Services • Local, Express, and Commuter Bus • Metro Subway – NW Suburbs to Downtown Baltimore • Central Light Rail Line – Northern Suburbs through Downtown to Southern Suburbs and Airport • MARC Commuter Rail – From NE Suburbs to SW Suburbs and Washington, DC • Existing E-W service limited, including only one high-speed bus line

  7. Comprehensive System • Red Line Part of Regional Plan • Expand Existing System

  8. Three Distinct Areas • Proposed Line Serves 3 Distinct Areas: • West Baltimore and Western Suburbs • Downtown Baltimore • East End (Fells Point / Canton) • 22 Proposed Stations

  9. West Baltimore and Western Suburbs Security Boulevard – MD 122 Eastern Terminus of I-70 – Proposed Station Location US 40 in West Baltimore

  10. The “Trench” US 40 Between West Baltimore Commuter Rail and Downtown

  11. Downtown / Inner Harbor Baltimore St - Location of Most Alignments Pratt St – Source of Congestion in VISSIM Models

  12. Fells Point / Canton Wider Boston Street to south of City Grid in Canton Area Narrow Street Grid in Fells Point

  13. Work Sharing and Modeling Standards

  14. Work Sharing and Modeling Standards • Synchro initially utilized to evaluate corridor • MTA and project team agreed upon VISSIM to analyze entire corridor, including preemption and TSP • Five Separate Consultants to complete VISSIM models • Single consultant chosen for oversight

  15. Work Sharing and Modeling Standards • Each consultant assigned a portion of study area to model • Model Areas chosen using logical break points: • 1-2: Park and Ride (Baltimore County and West Baltimore) • 2-3: W.Baltimore MARC Station • 3-4: US 40 / MLK Blvd. • 4-5: President St / Central Avenue

  16. Model Areas 1-2 Modeling Team 1 Area Modeling Team 2 Area

  17. Model Areas 2-3 Modeling Team 2 Area Modeling Team 3 Area

  18. Model Areas 3-4 Modeling Team 3 Area Modeling Team 4 Area

  19. Model Areas 4-5 Modeling Team 4 Area Modeling Team 5 Area

  20. Work Sharing and Modeling Standards • Standards Developed for Modeling Consistency • Speed profiles, turning speeds, links and connectors, etc. • Vehicle profiles uniform – including articulated buses and LRT vehicles • CD Distributed with base .inp file • Provided identical vehicle profiles for all models. • Aerials with .bgr - georeferenced models

  21. Work Sharing and Modeling Standards • Spreadsheet Developed and Distributed to Ensure Model Consistency

  22. Work Sharing and Modeling Standards • Standards were developed for most components of VISSIM models

  23. Downtown Model Development

  24. Downtown Model Development • Approximately 95 signalized intersections • N-S Arterials on east and west end • Alternating one-way E-W Streets

  25. Downtown Model Development • Synchro base model previously developed • Small blocks, Unique Lane and Turn Restrictions • VISSIM model developed from scratch • Divided into 3 sections to setup model: • MLK to Howard (600-650) • Howard to Calvert (650-700) • South to Central (700-750) • Read Additionally used

  26. Unique Characteristics of Downtown Model • On-Street Parking / Loading Zones in some locations • Off-Street Parking as source/sink • Initial Model did not include Conway Street • At times, I-95 and I-395 backs into Conway St

  27. Unique Characteristics of Downtown Model Initial Model Area Conway St. Intersection of Howard and Conway Constricting Point

  28. Unique Characteristics of Downtown Model • Routing decisions through 2,3, even 4 intersections (in existing conditions model)

  29. Unique Characteristics of Downtown Model • Model accounts for high pedestrians, including Leading Pedestrian Intervals

  30. Public Transportation System • Bus routing and headways obtained with established schedules • Bus stops field verified • Central Light Rail Line included • Dwell Times: • 15-25 sec. per bus • 30-50 sec. for Central Light Rail

  31. Central Light Rail Line

  32. Result – Comprehensive Downtown Baltimore Model

  33. Model Calibration Techniques

  34. Model Calibration Techniques • Calibration Standards: • Within 10% of counted link volumes • Within 20% of Travel Times

  35. Model Calibration Techniques • Travel Times calculated in field to mimic bus movements • Travel Times in model extracted to reflect field collection • For all vehicles, VISSIM expected to be higher • Buses comparable, less dwell time

  36. Model Parameters Adjusted • Driver Behavior Parameters • Safety Distance Adjustment • Lane Changing Behavior • “Saturation Flow Rate” – Additive and Multiplicative Distances • Some Links altered more than others • Creation of more than one parameter set per link type (Urban1, Urban2) • Account for more friction (e.g. Pratt St) • Minimum Lane Changing Distance (Connectors)

  37. Results • All 5 modeling teams met all calibration parameters set! • Higher confidence in model essential for alternatives analysis

  38. Alternatives Analysis

  39. Alternative Model Coding • Design Year of 2030 • All initial volume growth based on regional MPO travel demand model • Western Area models (Groups 1-3) utilized growth rate from MPO model • Downtown and East End account for parallel links and alternate routing by using TFlow Fuzzy Logic

  40. Use of TFlow Fuzzy • Existing VISSIM network routing and MPO growth used to develop base VISUM network • TFlow Fuzzy accounted for diversion – alternate one-way streets • Aided in redistribution of traffic in both Downtown and Fells Point

  41. Alternatives Considered • Shared Use BRT • Exclusive BRT • Exclusive LRT • Exclusive BRT with Downtown Bus Tunnel • Exclusive LRT with Downtown Tunnel

  42. Exclusive BRT – “Trench” Area

  43. Exclusive BRT – “Trench” Area

  44. Exclusive BRT – Baltimore / Lombard Transit Couplet

  45. Exclusive BRT – Baltimore / Lombard Transit Couplet

  46. Modeling Approach and Consistency • BRT/LRT Vehicle Characteristics consistent • Headways Based on Operating Plan for EIS • Dwell Times: 15-30 Sec. for BRT; 30-50 sec. for LRT • Vehicle Change and Clearance Intervals based on operating speeds and vehicle characteristics

  47. Modeling Approach and Consistency • Removal of existing travel lanes for exclusive transit lanes is anticipated to cause trip diversion • CBD, Fells Point – both are based on city grid • Use of T-Flow Fuzzy Logic in VISUM to estimate diversions

  48. Lessons Learned

  49. Lessons Learned • Establish a consistent approach at start of model process • Project controls / standards allow for easier and more accurate QA/QC review • Field verification a must for all elements • Understand how calibration data was collected • Regular communication between model teams

  50. Lessons Learned • VISUM / VISSIM integration utilizing TFlow Fuzzy ideally should be included early in model development • Take care in optimizing signal timings to minimize transit delay, vs. roadway corridor delay • Traffic signal timing plans should reflect how surface transit travels through the intersection • Communicate level of modeling effort early in the project