1 / 2

08:00 Meeting

08:00 Meeting. Action Items. Repair Van De Graaff – Gary Godfrey, Reggie Rogers Transportation of EM2 TEM/PSU and EGSE to bld 33 – Eliazar Ortiz Mechanical inspection of EM2 TEM/PSU connectors and standoff holes – Eliazar Ortiz, Joe Cullinan, Tom Borden, Jerry Clinton

Antony
Download Presentation

08:00 Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 08:00 Meeting

  2. Action Items • Repair Van De Graaff – Gary Godfrey, Reggie Rogers • Transportation of EM2 TEM/PSU and EGSE to bld 33 – Eliazar Ortiz • Mechanical inspection of EM2 TEM/PSU connectors and standoff holes – Eliazar Ortiz, Joe Cullinan, Tom Borden, Jerry Clinton • Setup for EM2 TEM/PSU bench tests – Eliazar Ortiz • Proof test of Mini-Tower assembly lift fixture – Dave Kiehl • Build Mini-Tower assembly cart/cage – Tom Nieland • EM2 TEM/PSU Safe-to-mate Test – Brian Horwitz • Swap-in EM2 TEM/PSU – Eliazar Ortiz • Setup for Single Bay LPT – Eliazar Ortiz • Execute Single Bay LPT (w/ EM2 TEM/PSU) – Brian Horwitz, John Canfield, Jim Panetta, Lester Miller • CAL pedestal and noise calibration (compare w/ EM1) – Brian Horwitz • Execute CAL CPT – Brian Horwitz, John Canfield • Execute TKR CPT – Brian Horwitz, John Canfield • Setup operator workstations in room 102 – John Canfield • Operator training (Gary, Tune, Larry, Brian, John) for data taking – Online, Offline • Check Cosmic Ray test data – Xin Chen

More Related