20 likes | 188 Views
08:00 Meeting. Action Items. Repair Van De Graaff – Gary Godfrey, Reggie Rogers Transportation of EM2 TEM/PSU and EGSE to bld 33 – Eliazar Ortiz Mechanical inspection of EM2 TEM/PSU connectors and standoff holes – Eliazar Ortiz, Joe Cullinan, Tom Borden, Jerry Clinton
E N D
Action Items • Repair Van De Graaff – Gary Godfrey, Reggie Rogers • Transportation of EM2 TEM/PSU and EGSE to bld 33 – Eliazar Ortiz • Mechanical inspection of EM2 TEM/PSU connectors and standoff holes – Eliazar Ortiz, Joe Cullinan, Tom Borden, Jerry Clinton • Setup for EM2 TEM/PSU bench tests – Eliazar Ortiz • Proof test of Mini-Tower assembly lift fixture – Dave Kiehl • Build Mini-Tower assembly cart/cage – Tom Nieland • EM2 TEM/PSU Safe-to-mate Test – Brian Horwitz • Swap-in EM2 TEM/PSU – Eliazar Ortiz • Setup for Single Bay LPT – Eliazar Ortiz • Execute Single Bay LPT (w/ EM2 TEM/PSU) – Brian Horwitz, John Canfield, Jim Panetta, Lester Miller • CAL pedestal and noise calibration (compare w/ EM1) – Brian Horwitz • Execute CAL CPT – Brian Horwitz, John Canfield • Execute TKR CPT – Brian Horwitz, John Canfield • Setup operator workstations in room 102 – John Canfield • Operator training (Gary, Tune, Larry, Brian, John) for data taking – Online, Offline • Check Cosmic Ray test data – Xin Chen