Build SF Tiles Project: Pier 14 Port of San Francisco Conceptual Design Presentation March 1, 2006. Admiration and Appreciation. Purpose. Atmosphere. Point of Reference. Adds an Artistic Feel. Provides information up for interpretation, an important aspect of San Francisco. Why?.
E N D
Build SF Tiles Project: Pier 14Port of San FranciscoConceptual Design PresentationMarch 1, 2006
Admiration and Appreciation Purpose • Atmosphere • Point of Reference • Adds an Artistic Feel • Provides information up for interpretation, an important aspect of San Francisco
Why? • Visited Pier 14 with Dan Hodapp from Port of SF and took initial sketches of site location • Visited the Maritime museum and listened to speakers. • Stephen Canright (curator) spoke about the short history of San Francisco. • With that, we brought up ideas of the past combined with ideas of the present.
Our Ideas and What We Discussed. • We had a large brainstorming session where we came up with many ideas… • Such as: • Possible “Before and after” tiles • Steamer ferry boats • Gold Rush sketches • Buried ships underneath the many buildings of downtown San Francisco • The Ferry Building • Seawall and aquatic life in the bay
DECISION • What we came up with was the theme of “Emblems by the Bay” • Too difficult to render “before and after” images of Bay • Instead we chose individual images with common theme of Bay
SKETCHES • Conducted research on agreed-upon terms to find: • HISTORY • SIGNIFICANCE • CONNECTION TO SF • Created sketches in representation of each term • Here they are!
What happens next? • Feedback from the Port • Solidify theme • Choose sequence of which sketch designs will go on each cutout • Choose colors for each tile • Paint samples of tile cutouts and submit to Port for review