The Application of Value Engineering in Construction Projects.-converted

The concept of value engineering was developed by Lawrence Miles<br>This concept was devised as a result of the material shortage of certain finished products during the Second World War<br>

BIMEngusllp
Download Presentation

The Application of Value Engineering in Construction Projects.-converted

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Application of Value Engineering in Construction Projects ▪The concept of value engineering was developed by Lawrence Miles ▪This concept was devised as a result of the material shortage of certain finished products during the Second World War ▪The only problem was the manufacturing process was running at full capacity through the shortage of goods. ▪Lawrence Miles worked for General Electric or GE ▪As he was not able to obtain any replacement material, it was quite necessary to obtain materials at maximum capacity ▪Value engineering began with a team-based approach ▪As it was more inclined towards engineering, the term “value engineering” was apt ▪Instead of value engineering, value management was adopted in a broad and higher-order description ▪Thus –

  2. ▪Value Management(VM) - was defined as a larger spectrum of value techniques ▪Value Planning (VP) – was defined as the planning phases of the project ▪Value Engineering (VE) – techniques applied during an engineering phase of the project Value engineering involves various parameters viz. ▪Identify various elements of a product or service ▪Analyze functions of an element ▪Delivering alternate solutions for a function ▪Assessing various alternate functions ▪Allocating costs to alternative solutions ▪Developing alternatives to drive high success rates What is the definition of Value? Value can be defined as product, service, or project performance. A good value product can be taken as a product with good performance. What is the meaning of Value Engineering? •Value engineering deals with focusing on a product or service at the most competitive pricing •Value engineering deploys a combination of analytical and creative techniques to identify other ways to achieve objectives •Value analysis or value engineering tends to make the product or process effective and profitable through the initial design phase. It should be noted that the technique of value engineering should never compromise product or service quality Areas of application •Automotive •Aeronautical Engineering •Civil Engineering •Defense •IT R&D •Etc The Value Engineering Job Plan The VE phase consists of the –

  3. Pre – Study •Collect User Attributes •Create data file •Determine various factors •Study the scope •Build various data models •Evaluate team composition Value Study Information Phase •Finish Data Package •Modify the scope •Who are the owners? •What is the requirement of these individuals? Function Analysis Phase •Function analysis based on identification, classification, cost, value index, and study. Creative Phase •Quantity Create a spectrum of ideas with the widest possible range of ideas by function Evaluation Phase •Select and rate alternate ideas •Best ideas will be used for the development Development Phase •This phase focuses on development viz. benefit analysis, data packages, implementation plan, and final proposals •Recognize unique ideas •Support and perfect your ideas •Prepare an accurate cost estimate •Analyze the risks Presentation Phase •Present various reports viz. Written and Oral After Studies

  4. •Complete the following changes •Implement the changes •Monitor the project status Significance of Value engineering in the Construction domain •The value aspect is measured in terms of cost and performance •It can also be measured for other aspects like time, productivity, energy, etc •This methodology is also applicable for construction projects and other soft areas viz, construction processes, healthcare, etc. •Value engineering for construction projects like buildings, factory construction, sewage plants can be applied on a project-to-project timeline •Every construction project is a onetime capital project, and value engineering must be applied in the initial phase of the design phase •If there are changes in design, then it can be achieved through lesser redesign, lower implementation cost, schedule impacts, and more •When value engineering is applied to construction engineering, it has clear benefits from a development point of view •It aims at increasing value based on cost and time •Maximizing a project function and reducing cost generates a “good value” for clients and developers •In the design phase, the project team reviews the proposed project and performs functional analysis, defines key criteria, and provides alternative solutions •The value engineering process consists of a workshop that includes the integration of – •Information – Gather information during the initial phase viz. project objectives, key criterion, and defining value •Speculation – Maximize function whilst reducing operating cost •Evaluation – Brainstorm ideas that can or cannot be used •Development – Workable proposals created on ideas that have passed the evaluation phase •Presentation – Making a final presentation of the findings Reasons for increased or poor costs and increased quality •Information inadequacy •Presence of temporary conditions •Inaccurate findings or beliefs •Very few ideas

  5. •Technology changes •Time Constraints •Lack good coordination BENEFITS OF ADOPTING VALUE ENGINEERING FOR CONSTRUCTION PROJECTS REDUCTION IN CONSTRUCTION COSTS •Construction projects have high function costs, these costs need to be reduced without sacrificing construction quality or using low-quality materials •If materials are old, then better quality materials have to be adopted with an economical solution Finishing the project before time •Finishing the project on time can leverage significant cost reductions. It is not necessary to boost the production speed, but the process can begin earlier Mitigating Mistakes in Project Drawings •Value engineering uses 3-Dimensional projects to maintain the quality of the project •Projects with errors can pose a negative value and are not suitable for the application, whilst projects with no or minimalistic errors are categorized as a positive effect in comparison to a negative effect •A 3-dimensional project prevents errors to be mitigated in the architecture phase itself Contact Us: - 703-994-4242 Visit us: - https://www.bimengus.com