1 / 7

Croos Pump (Shanghai) Co., Ltd

Croos Pump (Shanghai) Co., Ltd is the joint venture company of American Croos Pump (Group) Limited and Shanghai Shenbao Industrial Pump Co., Ltd. The factory is located in Shanghai Minhang Development Zone, occupying a production area more than 45,000㎡, specialized in design and manufacture Croos brand pumps, which are widely applied in petroleum, chemical, HVAC, water treatment, building, electric power, firefighting, industrial water supply and so on. The production line includes 5 series: axially split casing centrifugal pump, single stage single suction centrifugal pump, submersible pump, multistage centrifugal pump and chemical process pump.

Elaine2017
Download Presentation

Croos Pump (Shanghai) Co., Ltd

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Croos Pump (Shanghai) Co., Ltd http://www.croospump.com/ Croos Pump (Shanghai) Co., Ltd Company Profile Croos Pump (Shanghai) Co., Ltd is the joint venture company of American Croos Pump (Group) Limited and Shanghai Shenbao Industrial Pump Co., Ltd. The factory is located in Shanghai Minhang Development Zone, occupying a production area more than 45,000 ㎡, specialized in design and manufacture Croos brand pumps, which are widely applied in petroleum, chemical, HVAC, water treatment, building, electric power, firefighting, industrial water supply and so on. The production line includes 5 series: axially split casing centrifugal pump, single stage single suction centrifugal pump, submersible pump, multistage centrifugal pump and chemical process pump. Croos pumps are universal products. Adopt the world most advantage technology to make the efficiency and performance at a high level, in both international and domestic markets we have enjoyed a very good reputation. At present, our customers are all over the world, such as USA, Russia, Britain, Germany, Denmark, Spain, Singapore, Thailand, Vietnam, Poland, South Africa and other countries. Quality is the life of enterprise, a strict inspection system is built in our factory. We always offer reasonable price and high-quality products to customers. We have got the certification of ISO9001 quality control system, CE certification, and China national CCC Compellent products certificate. We sincerely hope to cooperate with the national and international partners and grow together for a brilliant future. Products Category: Axial Split Casing Centrifugal Pump; Single Stage Single Suction Centrifugal Pump; Multistage Centrifugal Pump; Submersible Pump; Chemical Process Pump Tel: +86-21-64092786 Email: export@croospump.com

  2. Croos Pump (Shanghai) Co., Ltd http://www.croospump.com/ Company Culture "To the user as the center, the pursuit of the international first-class quality" to improve enterprise competitiveness, to provide customers with satisfactory products and services. After-sales Service Quality Guarantee One. Pre-sale service guarantee: 1. Help customers select the models of our products according to the technical requirement. . 2. Supply the necessary documents for your ordered products, including products introduce, performance parameter, installation dimension, installation debugging, matters need attention and so on. Two. The sale of service guarantee: 1. As quality and quantity to supply the contract products on time. 2. As Fob price term, our company supply transport and quality insurance on the way for free in China. 3. As CIF price term, our company supply transport and quality insurance on the way for free from China to your sea ports. Three. After service guarantee: 1.Quality guarantee: 12 months ;. 2.Within quality guarantee period, should the parts of pumps, motors, baseplates suffer damage which is not artificially caused, we will replace the unit immediately without charge. 3.If there is any problem during installation, our company will make installation plan no more than 2 hours after receiving your notice, and guide users to install and connect the pump units correctly. 4.Over the quality guarantee period: Our company is responsible for repairing, the cost of parts should be paid by the user. 5.Our company will supply service after the sale for the whole day. If you call us when you have any problem, we will respond in 2 hours. 6.For the maintenance, if you need, our company will teach the person who appointed by you. We will appoint a special person to guide you during the maintenance period. During the quality guarantee period, our company will guide for the normal maintenance service, including all the check, adjusting and lubrication for the system. Also if you need, we can send our technical engineers to help you at site. 7.Our company will service for you periodically when you use our products. 8.During using period, to make the products working very well, we will cooperate with you about products service. Tel: +86-21-64092786 Email: export@croospump.com

  3. Croos Pump (Shanghai) Co., Ltd http://www.croospump.com/ Four. During for sale, on sale, after sale period, if you have any problem, our company will reply you or resolve it immediately. After sale service department in Shanghai head office: Tel:86 021 6409 5555 Fax:86 021 6409 5040 Techincal Help PIPELINE CONNECTION The water pipe should have its own supports in order to avoid all the weights depressing on the pump. The pump line should be connected to the discharge nozzle by means of a flaring pipe with taper 1:7. The average flowing velocity of water in the pipe is recommended not to exceed 2-3 m./s. As for the suction pipe, the follows must be considered: the pipe must be as short as possible so as to reduce the resistance possible.The pipe must be bent according to prevailing regulation. It is not permitted to have too small bending curvature in order to avoid producing excessive losses.The connections of the pipes must be tight to prevent air from entering into the pipes. When the pump position is higher than the water level, a foot valve should be installed at the bottom of the suction pipe or priming by a vacuum pump. A gate valve and a non-return valve are installed between the discharge pipe and the pump. The inner diameters of the valves must not be smaller than the discharge pipe. The non-return valve is located on fro-side of the gate valve. OPERATION  Inspecting the dates in the nameplate such as capacity, head, speed, and they must be accordance with the requirement.   The couplings shall be operating smoothly when rotating the pump by hands. The starting task is to inspect whether the rotation direction of the motor corresponds to the requirement of the pump.  The valves, the pressure gauge on the discharge nozzle and the screwed plug on the vacuum gauge must be closed. Tel: +86-21-64092786 Email: export@croospump.com

  4. Croos Pump (Shanghai) Co., Ltd http://www.croospump.com/  The pump shall is filled with liquid before starting. For pumps with a suction diameter equal to or less 300mm, the plug on the pump cover must be taken out and water is poured in through the plug hole on the top of the pump cover. For pumps with a suction diameter larger than 350mm, open the cock on the top of the pump cover and under the water indicator, and then start the vacuum pump. When the water level reaches the water indicator, clock the cock immediately.  Having done the procedure described above, start the motor and open the cock for a pressure gauge.  When the rated revolution of the pump is obtained and the pressure gauge shows a proper reading, open the cock for the vacuum gauge and the gate valve on the discharge pipeline gradually up to the required extent. For stopping the pump, close the gate valve on the discharge pipe line gradually, close the cock for vacuum gauge, then stop the motor and close the cock for the pressure gauge. Caution: when the ambient temperature is at 0℃ or below, the water remained in the pump must be drained off through the holes under the suction and discharge nozzles. When the pump is to be out of use for a long time, it must be disassembled, cleaned and then packed for storage. WARNINGS  Pay attention to the bearing temperature. The bearing temperature should not exceed the ambient temperature by 55℃ and its maximum temperature not exceed 85℃.  The lubricating grease should be changed after first 80 hours operation and once every 2400 hours operation afterward. The bearing housing is filled with grease, which occupies 75% of the space in it. The lubricant used for the bearings is lithium basic grease.  Leakage of 10 to 20 drops per minute from stuffing box is a normal phenomenon. If the leakage is too large or too small, then the stuffing gland should be tightened or loosened. The packing consists of individual round – shaped rings, the joints of which alternate by an angle of 120 degrees successively for the convenience of pressing tightly. The stuffing shall be changed when the leakage is too large.  The flexible coupling, the elastic washers, the screw and etc, should be inspected periodically and pay constant attention to the motor bearing temperature.  The pump should be inspected after each 2000 hours operation. In case the diameter clearance between the wear ring and the impeller exceeds 2mm, the wear ring should be replaced. DISMANTLEMENT Tel: +86-21-64092786 Email: export@croospump.com

  5. Croos Pump (Shanghai) Co., Ltd http://www.croospump.com/  Close inlet and an outlet valve, open the drain plug of bottom and air release plug of top to ensure there is no water in the pump.    Dismantle the entire assistant pipeline. Dismantle the pin which is between shaft couplings. Loosen the casing-bottom half (1) and a casing-top half (2) connecting bolts, separate the cover and casing and put the cover to a safe place.  Lose the connecting bolts of the left bearing housing and right bearing housing (14), loose the connecting bolts of left bearing cover and right bearing cover.  Pull of left and right bearing housing, load out the whole rotor and put to horizontal and safe place for dismantling.  Dismantle bearing housing, bolt, ball bearing, left bearing cover, slinger, left mechanical seal or gland packing, dismantle seal housing (12), left mechanical seal shaft sleeve or gland packing shaft sleeve.   Disassembling the impeller (4), the casing wear ring (3), and the impeller key. Disassembling the coupling guard and coupling, right bearing housing (14), loose spring ring, withdraw from the bearing, removed the right bearings cover, the right slinger, the right mechanical seal (or packing seal) components, and then closed down the right seal housing.  Dismantle static ring of mechanical seal cover. RE-INSTALLATION  Re-installing by opposite order of disassembly. When installing, all the o ring should be new, the installation place should be clean. Clean all the parts connecting and bolts, pay attention to impeller running direction.  Check the clearance between impeller and seal ring, if the clearance is over 1mm, should change seal ring or impeller.  When installing mechanical seal, the seal face should be added lubricate oil and the mechanical seal shaft sleeve should be very smooth and clean. When the static ring has been installed, should check the balance degree between face and cover.  When installing gland packing, the cut face of gland packing should be smooth and flat, the position of the cut face should be stagger, gland packing should be well pressed, not too tight and not too loose, otherwise, the bearing will be hot and affect the normal operation. STORAGE   New pump storage: load at dry place, the longest store period is 10 month. If the pump is not used for a long time, the suction valve should be shut. Running once every 3 months to ensure the pump can be operated every time. Tel: +86-21-64092786 Email: export@croospump.com

  6. Croos Pump (Shanghai) Co., Ltd http://www.croospump.com/ Maintenance Failure Causes Remedy The pump does not suck in water. The hands of the pressure gauge and the vacuum gauge vibrate violently. The pump priming is not sufficient. There is an air leak in pipeline or instruments. Prime the pump again. Eliminate the air leak by tightening or plugging. The pump does not suck in water. The vacuum gauge shows high vacuum valves. The foot valve has not been opened or is blocked up. The resistance of the suction pipeline is too large or the water level at the suction side is too low. Adjust or replace the foot-valve. Clean or change the suction pipeline. Raise the suction water level The pressure exists at the discharge nozzle, but no water is delivered. The resistance of the discharge pipeline is too high. The motor rotation direction is wrong. The impeller is blocked up. The pump speed is not sufficient. Check or shorten the discharge pipeline. Check and correct the motor rotation direction.Clean the impeller. Increase the pump speed. The capacity is less than the expected valve. The pump is blocked up. The wear ring is worn off too much. The speed is not sufficient. Clean the pump and the pipelines. Replace the wear ring. Increase the pump speed. The power consumption of the power is too high. The packing in the stuffing box is pressed too tightly and heated by friction. The impeller is worn out. The capacity is too high and the pump is overloaded. Adjust the packing or replace it with a new one. Replace the impeller. Reduce the capacity by means of increasing the resistant in the discharge pipeline. Tel: +86-21-64092786 Email: export@croospump.com

  7. Croos Pump (Shanghai) Co., Ltd http://www.croospump.com/ The pump produces abnormal noise and does not suck water. The capacity is too large and the pump is overloaded. The resistant in the suction pipeline is too large. The suction height is too high. Air pocket exists at the pump suction portion. The temperature of the pumped liquid is too high. Reduce the capacity by means of increasing the resistance in the discharge pipeline. Check the resistance in the suction pipeline. Check the foot valve. Reduce the suction height. Eliminate the air leak by tightening and plugging. Lower the pumped liquid temperature. The pump vibrates. The pump shaft and the motor shaft are not aligned properly or the pump shaft is slant Adjust the alignment of the pump shaft and the motor shaft in accordance with the requirement. The bearings are overheated. Leak of oil. The pump and motor shafts are not aligned properly. The oil ring does not rotate. Fill in the bearing housing with oil.Adjust the alignment of the shafts.Check and clean the bearing housing. Tel: +86-21-64092786 Email: export@croospump.com

More Related