1. DDAR Modernization Description and visualization refurbishment
2. DDAR Modernization Content General description
Exterior
Interior
Technical issues
Planning
Visuals
General plans
3. DDAR Modernization General description Scope:250 units 6-trainset 4-trainset Total50 mBk 25 25 75 Bv 50 2575 Abv 50 2550 ABvk 25 25250 units 150 100 250
Customer: NS Reizigers
Refurbishment exterior and interior
Transformation to intercity train
Long term overhaul
15 years lifespan
4. DDAR Modernization Exterior Upgrade in accordance with the draft design, main issues:
General:
- Removal of the airinlets in de sidewalls of the upper deck
- Replacement of open windows by closed windows lowerdeck
- Enlarge air grids in the roof above the entrance doors for the air conditioner
5. DDAR Modernization Exterior II HeadDriver’s cabin Bvk’s and mABk’s will be readjusted to suit temporary design (attached visualization/form and diagram are not representative)
Outside doorsUnchanged system and dimensions,Light will be added above or next to every entrance door to signal failures of the door.
Colour scheme- Coaches will be in IC-formula colourscheme for bi-level trains (yellow with blue striping horizontally)
6. DDAR Modernization Interior General- Upgrade suiting contemporary design, main aspects- Glass partition walls and glass partition doors (where possible)- Door between the coaches remains as it is; only new colourscheme- 1 toilet for disabled to be installed per train set - 1 normal toilet in each ABv
(see general plans for details)
7. DDAR Modernization Interior design Interior Design- Transparent and open character of design- Clear, pleasant level of lighting, application dependent on contact- and privacy spaces- Lay-out passenger areas in accordance with requirements of the IC-formula- New luggage racks, tables, new vis-a-vis / coach seats, etc.- Doorknobs will be designed by an artist chosen by NSR- Adjustable individual lighting in first class- New wall and ceiling panelling- Rubber floor covering
Design in accordance with concept visualizations
Further details of design to be discussed with designer and customer
8. DDAR Modernization Interior systems Dynamic Travel Information System
- Destination indication outside remains- Preparatory work for Travelling Information System and entertainment system, CCTV and wireless Internet
Ventilation
- All coaches will be provided with air conditioning
9. DDAR Modernization Cabin / Conductor’s room Several minor changes
Colourscheme in accordance with the coloring of the passenger compartments
10. DDAR Modernization Technic Adjustments / Maintenance- Technical revision (long term overhaul)- Minimalization of additional weight, reduction if possible.- A high level of reliability of changed or new installed systems- No change in total costs for maintenance and cleaning- Lowering of costs is desirable
Power- Energy reduction is desirable- Target: 5%
11. DDAR Modernization Planning Start project january 2009
Design freeze september 2009
Start pre try out (4 units) january 2010
Start production february 2011
Last delivery march 2013
Withdrawal: 25 units/time
12. DDAR Modernization Visualizations refurbishment 1st class Lower dec
13. DDAR Modernization Visualizations refurbishment 1st class Upper deck
14. DDAR Modernization Visualizations refurbishment 2nd class Lower deck
15. DDAR Modernization Visualizations refurbishment 2nd class Upper deck
16. DDAR Modernization Entry Vestibule
17. DDAR Modernization Exterior
18. DDAR Modernization Visualization Current DDAR1st Class Lower deck
19. DDAR Modernization Visualization Current DDAR2nd Class Upper deck
20. DDAR Modernization Exterior Current DDAR
21. DDAR Modernization General plan ABv
22. DDAR Modernization General plan ABvk
23. DDAR Modernization General plan Bv
24. DDAR Modernization General plan mBk