Presenter Name John Moore Chief Contracting Division Savannah District 20 May 2010 CONSTRUCTION CONTRACTING
AGENDA • ACQUISITION PROCESS • ACQUISITION PLANNING • ACQUISITION DECISIONS • BEST VALUE • BEST VALUE CONTINUUM • TRADE OFFS • SOURCE SELECTION CRITERIA • SOURCE SELECTION DECISION • SOCIO-ECONOMIC CONSIDERATIONS • IDIQ CONTRACTS • MATOC COMPETITION PROCESS • BENEFIT OF MATOCS/SATOCS
Considerations in Acquisition Planning • Project Size and Budget • Scope Complexity • Urgency • Customer/Politics • Funding Stream • Market Conditions • Socio-Economic Programs • Availability of Current Contract Vehicles • In-House Staff Capacity/Capability
Acquisition Decisions • In-House vs. Contract • Solicitation – IFB or RFP • Contract Type – Fixed Price or Cost • Small Business or Unrestricted • Design-Bid-Build or Design-Build • Existing Contract or New Acquisition • Sole Source or Competitive • Acquisition Planning is Risk Management!
The Best Value Continuum Assumes Greatest Risk/ Control Invitation for Bid – Sealed Bid Low Price Technically Acceptable Price-Performance Trade-off One Step Design-Build GOVERNMENT Two Step Design-Build CONTRACTOR Assumes Greatest Risk/Control Least Control
THE BEST VALUE CONTINUUM • INVITATION FOR BID • PROs: • Relatively fast acquisition phase • Less Resources needed during acquisition • CONs: • Government assumes most risks • No quality control over Contractor selection • No negotiations! • Long lead time for design
THE BEST VALUE CONTINUUM Request for Proposal • PROs: • Contractor selection based on pre-established evaluation criteria • Performance evaluated with price • Ability to negotiate • CONs: • More resource intensive • Acquisition Time is Longer
BEST VALUE TRADE-OFFS • QUALITY • SCOPE • PAST • PERFORMANCE RISK • COST • SCHEDULE • PROJECT REQUIREMENTS • SIZE • COMPLEXITY • FUNDING STREAM • RESTRICTIONS
SOURCE SELECTION CRITERIA • True discriminators have the following characteristics: • A reasonable expectation of variance among offerors • An assessable variance (quantitative or qualitative measurement) • The requirement(s) warrant a comparative evaluation • of that Factor (worthy of a Price/Cost Premium) Do Criteria Focus on Issues of Substance? Is there time to evaluate the selected criteria? ID of skilled evaluators to assess the criteria?
THE SOURCE SELECTION DECISION • Represents the Source Selection Authority’s rational and independent judgment; • Is based on a comparative analysis of the proposals; • Must be consistent with solicitation evaluation factors and subfactors. • Must Reflect Why Discriminators among Offerors (e.g. Lower Risk, Better Past Performance, Strengths and Weaknesses) are: • Worth of any Price Premium, or • Not Worth of a Price Premium
Socio-economic Considerations: Unrestricted Small Business 8(a) HubZone SDVOSB
SOCIO-ECONOMIC TARGETS Small Businesses 32.0% Small Disadvantaged Businesses 18.0% Women-Owned Small Businesses 5.8% HUBZone Small Businesses 10.0% Service Disabled Veteran-Owned Small Bus. 3.0% HBCU/MI 13.0%
IDIQ Contracts • Multiple Award (MATOC) • Multiple contractors • (compete for task orders) • Examples • GSA • COS • etc • Single Award (SATOC) • One contractor • (no competition for task orders) • Examples • 8(a) < $3 Million • A-E • O&M Construction
MATOC COMPETITION PROCESS • RFP Letter & SOW • Evaluation Criteria Identified in RFP Letter • Technical Board for Design Build T.O.s • Importance of Price vs Technical • Source Selection Decision
THE BENEFIT OF MATOCS/SATOCS • Time Advantage - No 30 day Synopsis • Ability to manage workload/manpower • Limited Number of Offerors • Less Cost to Issue/Award a T.O. • Can Involve Contractors During Design Development • More Balanced use of MATOCs and Stand Alone Contracts as Workload Draws Down