1 / 13

Association of California Airports Contracting for Construction Management Services

Association of California Airports Contracting for Construction Management Services. September 11, 2013. Advisory Circular 150/5100-14D Definitions. Planning Services A/E Services Preliminary Design Phase Bidding & Negotiation Phase Construction Phase Special Services.

leyna
Download Presentation

Association of California Airports Contracting for Construction Management Services

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Association of California AirportsContracting forConstruction Management Services September 11, 2013

  2. Advisory Circular 150/5100-14DDefinitions • Planning Services • A/E Services • Preliminary • Design Phase • Bidding & Negotiation Phase • Construction Phase • Special Services

  3. A/E ServicesConstruction Phase • Considered Basic or Construction Administrative Services • DO NOT satisfy requirements of AC 150/5300-12A

  4. Advisory Circular 150/5100-12AQuality Control of Construction for Airport Grant Projects • Sponsors Responsibilities • Engineering Services (150/5100-14) • Pre-design, Pre-bid, and Preconstruction Conf (150/5300-9) • Supervision and Inspection

  5. 150/5370-12A c. Supervision and Inspection • Mandatory for Airport Improvement Program (AIP) Projects • Design Phase (150/5370-10 Standards for Specifying Construction of Airports) • Construction Phase • Beyond the Scope of A/E Services • May be provided by Sponsor/Consulting Engineer/Separate Agreement

  6. CriteriaFor Selection • Qualifications • Prior field experience • Qualified to make interpretations of the design INTENT • Have knowledge of Testing Requirements

  7. Single Consultant vsSeparate Agreement • Pros • Clearly understands the INTENT of the Drawings • Produces Biddable/Buildable Projects • Reduce Delays in RFI/Submittal process • Reduce Delays in the inevitable Changed Condition/CCO pursuit • Saves Construction $ by minimizing delay costs

  8. Single Consultant vsSeparate Agreement • Pros • Clearly understands the INTENT of the Drawings • D.O.R.

  9. Single Consultant vsSeparate Agreement • Pros • Produces Biddable/Buildable Projects • DOR with Construction Experience

  10. Single Consultant vsSeparate Agreement • Pros • Reduce Delays in RFI/Submittal process • DOR provides immediate response

  11. Single Consultant vsSeparate Agreement • Pros • Reduce Delays in the inevitable Changed Condition/CCO pursuit • Saves Construction $ by minimizing delay costs

  12. Single Consultant vsSeparate Agreement • Cons • Perception of a Conflict of Interest • Protection from Design Errors/Omissions that cause additional cost

  13. Contracting for Construction Management ServicesConclusion: • Question/Comments Thank you