Bay Area Toll AuthoritySan Francisco-Oakland Bay Bridge East Span Seismic Replacement Project IBTTA April 19, 2009
A long history…. • Extensive Public Input • Multiple Design Alternatives • Multiple Administrations • September 11 • Single Bid
Accountable Project Delivery AB 144 established the Toll Bridge Program Oversight Committee, composed of Director of the California Department of Transportation (Caltrans), and the Executive Directors of the California Transportation Commission (CTC) and the Bay Area Toll Authority (BATA), to be accountable for delivering the seismic project. On the right track…. WILL KEMPTON Director California Department of Transportation STEVE HEMINGER Executive Director Bay Area Toll Authority Bimla Rheinhart Executive Director California Transportation Commission
ZPMC - Shanghai, China 2.25 miles
ZPMC - Shanghai, China ZPMC Fabrication Facilities
Shop Drawing Preparation Sub-Assemblies Fabrication Segment Assembly Blast, Paint & Fit Up Ready To Ship
Steel Roadway Decks Steel Roadway Boxes Under Fabrication
Roadway Deck Fabrication Shop Steel Roadway Boxes Under Fabrication
Steel Roadway Decks Steel Roadway Boxes Under Fabrication
Temporary Supports Temporary Support Structures
Temporary Support Truss Looking East Temporary Support Structures
Skyway (2007) Completed Skyway