30 likes | 53 Views
Details about the Documents required for DEWA approvals.
E N D
DEWA Approvals Dewa is a sole provider of electricity, sewerage and water in Dubai. Its objective is to provide world wide client service. Dubai Electricity and Water Authority approvals must be taken in Dubai which permits us to get basic service and with the assistance of SLM qualified team who skilled with DEWA Approvals will get you approval for industrial also as residential water and electricity needs. Therefore by maintaining its motive it’s developed its tips for Dubai electricity and Water customers for the NOC’s submission below DEWA approval. DEWA approval procedure All applications should be submitted through online gateway. Once submitted, the standing of the application could be tracked online and notified through SMS and E-mails. It takes up to seven operating days to receive a NOC from DEWA. Once DEWA approves the technical drawings, then an application for a technical field verification is submitted.
DEWA can then prepare installation meters and provide the power connection, once the protection deposit has been paid, which should be directly done through DEWA’s on-line Portal. Documents needed for DEWA Approvals The Documents needed for DEWA approvals are Copy of DEWA approved TCL/MD, MDBs/SMDBs. Wiring layouts- lighting Load distribution schedules of distribution boards. Wiring Layouts-Power Landlord No objection certificate (In DEWA prescribed Format) Tenancy contract, Trade licence and Passport copy.
The submitted application and documents is reviewed by DEWA and you’ll be notified through SMS. As your application is approved, you’ll be ready to transfer the approval from DEWA E-Services. Submission of fit-out application for obtaining DEWA Approval may be a service that helps customers to get a fit-out power connection to their outlets and offices. This process is free of cost. Smart applications through Good meters and grids will be provided with different advantages and new applications to its customers, together with automatic and attentive reading (both current and historical). The information obtained through these readings will be accessible to the customers to monitor actual consumption for a selected amount of time. DEWA has additionally provided smart app facility with options like Building No objection certificate – Electricity Demolition No objection certificate – Electricity epay – Clearance Certificate epay – Move in Location of Electric vehicle Charging Stations Hayak – new live chat client support