1. Champlain Bridge Closure February 10, 2010
NYSEMA
7. Pier Deterioration
8. Pier Deterioration- trend
9. Basis for Bridge Closure Weakened structural system
Recent pier deterioration rapid & significant
Abrupt failure of unreinforced concrete possible
Frozen bearings inflexible in cold temperatures
Freeze/thaw increases damage & risk
Unacceptable risk to the public
10. Impacts Fire
EMS
Medical
Commute Times
Financial
Child Care
Business Interruption
Agriculture
11. State Agencies Involved DOT
SEMO
DOL
DOH
Empire State Development
OCFS
OFPC
DSP
15. Ticonderoga Ferry 18 Cars 7 minute crossing
Operating Hours
May 1- July 3 8:00 a.m. - 6:00 p.m.
July 3 thru Labor Day8:00 a.m. - 7:00 p.m.September 2 to
October 318:00 a.m. - 6:00 p.m.
Rates - Driver and Passengers Included
Cars and Small Pickups - $8 one way - $14 round trip
One Ton Trucks$9 one way - $16 round trip
Motorcycles - $5 one way
17. Essex Charlotte Ferry 35 Cars
Summer Schedule
Departures every 30 minutes from VT. Between 7 a.m. and 9:30 p.m.
From NY every 30 minutes between 7:30 a.m. and 10 p.m.
Vehicle and Driver $9.50 / $18.00 RT
Adult passenger $3.75 / $6.25 RT
25. Further investigations Further Diving inspections
26. Weather
Depth of water
Safety of construction workers
Further evaluation of the Piers revealed larger problems - large deep cracks
Pier Encapsulation dismissed as viable
29. State Actions Signed Detour including VMS and HAR
Improved Ferry Service (longer hours)
State Disaster Emergency
Ferry Subsidies
Public Transit
Development of Park and Ride Lots
Shuttle Services
New Ferry Services
Evaluation of Temp Bridge Sites
30. Other Actions Websites for Information
Public Meetings
SEMO Outreach Center
Public Advisory Committee (PAC)
Business Assistance
Coordination with other state agencies ongoing throughout all activities
31. Ultimate Solutions Demolition
Controlled explosive demo (spans 4-9)
Traditional demo (spans 1-3; 10-14)
Open New Ferry Service
To operate until new bridge opens
Design of replacement structure
36. NYSDOT Web site: www.LCBclosure.org
VTrans Web site: www.aot.state.vt.us
Addison Co. VT Chamber of Commerce Web site:
www.crownpointbridgeupdates.com
Call Center: 1-888-769-7243 or 518-465-1159
E-mail: r01-lakechamplainbridge@dot.state.ny.us