70 likes | 78 Views
In the electrical installation of buildings, a cable tray system is used to support insulated cables used for power-sharing, control, and report.
E N D
FRP Cable Tray Manufacturers Sharing Responsibilities Of Workmen For Installing Cable Trays
FRP Cable tray installation cannot be done by one person as there is an entire team that completes the installation. There is a project manager, site engineer, foreman, and safety engineer. FRP Cable trays manufacturers will list significant responsibilities of these people with the readers.
Project Manager • Project manager is a person who handles the installation process. The basic responsibilities of the project manager are- • To check that all the preparation and application works are done as per the contract specification. • To ensure the progress should be carried out as per the planned program and approved method statement. • To ensure that equipments and material required for the site work are present there as per the planned construction programme. • To be in a contact with main contractor and coordinate with him, MEP co-coordinator and safety officer to ensure safe and apt execution of the plan.
Site Engineer • Site engineer is a person who stays on the site and handles the project. Here are few responsibilities of a site engineer for installing cable tray- • He checks that the works are done as per the CONTRACT SPECIFICATIONS that are approved method statement. • He provides all required data and information and distributes responsibilities to the construction team he handles. • He monitors the progress of project and report to project manager. • He coordinates with safety office to ensure that the installation work is done under secure practicing methods.
Foreman • Foreman is a person who analyzes the site and helps site engineer in getting the work done. His responsibilities are- • He coordinates with site engineer regularly and ensures proper distribution of workforce in the planned location. • He ensures with site engineer that the manpower for project is moving as per the contract. • He updates site engineer about the work progress. • He controls waste materials disposal as per the instructions he gets from site engineer. • He informs site manager which areas are ready for inspection.
Safety Engineer • Safety engineer is a person who checks the safety aspects on the site. His responsibilities are- • He checks implementation of all safety measures. • He checks whether the implemented measures are sufficient to maintain the safety at work site. • He inspects the site activities and train the staff to avoid accidents • He reports to project manager and client. • He is responsible for site maintenance. • FRP Cable tray manufacturers have shared this information with their products’ users to widen their knowledge level. You can share your thoughts with respect to this post in comment section.
+91 97128 50506 +91 95866 50506 +91 97125 45777 https://www.tribenifiber.com/ 510,Luxuria business Hubbefore VR Mall next to dumas resortDumas Piplod roadSurat 395007. info@tribenifiber.com