1 / 7

Cat5e Cabling

USub is a leading seller of the server rack, Charging cabinet, Wall mount rack, server relocation, cat5e, and cat6 cabling at Hongkong. Call us at 852 62545444<br>

Usub
Download Presentation

Cat5e Cabling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Center Solution

  2. If your data center is small, you can save hundreds of dollars every month by using best practices and making smart choices in equipment. Inefficient energy consumption adds to the bills which is something data centers want to avoid. Using small steps we can conserve energy making big savings each month

  3. ELV Structure Cabling For copper wire Cat5e or Cat6 and optical fiber optical fiber cabling projects, Usub not only provides professional wires, but also provides one-piece cable and installation surface services, which are suitable for Internet phone switches, Access Points, CCTV, and IP Networking equipment.

  4. Server Rack Relocation Rack Relocation Service USub has an experienced cabinet moving team and professional tools to provide relocation services. Inspection and assessment of the new and old on- site environment. Set the best relocation route and manpower arrangement Protect packaging and safe delivery Reinstall the equipment to the cabinet Check that the wiring and devices are working properly

  5. Network Copper Cable and Optical Fibre Testing Testing services are divided into: Standard testing-suitable for various commercial and residential projects. professional Fluke testing-data center, 10G speed test, Fluke test report is required The test service is suitable for: The copper wire needs to be checked and accepted after the completion of the pull and connection. The optical fiber needs to be accepted after the completion of the pull and connection.

  6. As per the global standardization, all IT equipment can work with input power ranging between 100V and 240 AC. You achieve higher efficiency at higher voltages. When you run the equipment at lower voltages, there is an increased loss of energy. You can save money by using the right equipment such as a good power cord. You gain an incremental advantage when you change the input power.

  7. Contact Us +852 62545444 www.usub.hk info@usub.hk

More Related