O & M Challenges in Power & Blowing Stations

O & M Challenges in Power & Blowing Stations. Power & Blowing Stations of SAIL. Main Objectives:- Supply uninterrupted cold blast to all the blast furnaces, as per their requirement . Supply process steam at require temperature and pressure.

aackley
Download Presentation

O & M Challenges in Power & Blowing Stations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. O & M Challenges in Power & Blowing Stations

  2. Power & Blowing Stations of SAIL Main Objectives:- • Supply uninterrupted cold blast to all the blast furnaces, as per their requirement . • Supply process steam at require temperature and pressure. • Generate power to cater to category-I loads of Rourkela Steel Plant • Maximize MVAR generation for improving drawl power factor. • To maximize utilization of the waste gases (BF Gas & CO gas) arising out of the steel making process. • To maximize power generation opportunity from other avenues available in the steel making process. (TRTG & BPTG)

  3. TOTAL SAIL LOAD [MW] (including VISP, SSP & CFP)1206

  4. CAPTIVE POWER PLANT -I The plant and equipment's • High Pressure Boilers – 1 to 6. • Turbo Blowers – 1 to 5 • Turbo Alternator – 2,3,4 & 6 • Medium Pressure Boilers– 1,2 & 3 • Coal Handling Plant – Old (150 Tons/Hr. and New. • Water treatment Plant – 1 & 2 • Cooling Water pump House and cooling Towers. • Ash Slurry Pump house and Ash handling system. • Electrical Distribution system at 33 KV, 6.6 KV & 415V.

  5. CAPTIVE POWER PLANT -I Fuels Used • Coal – Boilers are designed for coal CV of 5600 Kcal/Kg. • Present availability of coal CV varies from 1500 – 3500 Kcal/Kg. with Ash content maximum up to 46%. Presently coal is supplied from Mahanadi Coal Fields and Eastern Coal Fields. (This variation in coal CV affected the performance of CPP-I to a great extent. • Blast Furnace Gas – calorific Value – 900 Kcal/Kg. • Mixed gas – Calorific Value – 4000 Kcal/Kg. • Furnace Oil – Calorific Value - 9800 Kcal/Kg.

  6. CAPTIVE POWER PLANT -I Maximum consumption of BF gas in Boilers • HP Boiler # 3 & 4 – 8X11000 Nm3 ( each Boiler have 8 burners) • HP Boiler # 5 & 6 – 5 X 22000 Nm3 ( each Boiler have 5 burners) • Maximum consumption of CO gas in • HP Boiler # 1 & 2 – 1X2000 Nm3 ( each Boiler have 1 burners) • HP Boiler # 3 & 4 – 4X3000 Nm3 ( each Boiler have 4 burners) • HP Boiler # 5 & 6 – 2X1000 Nm3 ( each Boiler have 2 burners) • MP Boiler # 1 & 2 – 2000 Nm3 ( each Boiler have 4 burners) • MP Boiler # 3 – 4X2000 Nm3 ( each Boiler have 4 burners) • Coal consumption rate of each feeder of HP Boiler # 1 & 2 is 2 T/hr. (12 nos of Coal Feeders in each Boilers).Average consumption of coal in AFBC boilers is 18 T/hr/ Boiler. • Coal consumption rate of each Coal Mill of HP Boiler # 5 & 6 is 8 T/hr. ( 3nos of Coal Mills in each Boiler). Average consumption of coal in PF boilers is 20 Tons / Hr / Boiler.

  7. CAPTIVE POWER PLANT -I • Coal consumption rate of MP Boiler # 1 & 2 is 12 T/hr. • Average consumption of coal in MP Boiler# 1 & 2 boilers is 8 T/hr/per Boiler. • Coal consumption rate of MP Boiler # 3 is 12 T/hr. • Average consumption of coal in MP Boiler# 3 is 10 T/hr/per Boiler. • Average Steam Generation from HP Boiler 1 & 2 – 80 T/ Hr. • Average Steam Generation from HP Boiler 3 & 4 – 90 T/Hr. • Average Steam Generation from HP Boiler 5 & 6 – 95 T/Hr. • Average Steam Generation from MP Boiler 1 & 2 – 35 T/ Hr/Boiler • Average Steam Generation MP Boiler # 3 – 45T/Hr.

  8. CAPTIVE POWER PLANT -I HP Boiler # 1, 2, 3 & 4 • Commissioned in the year 1959-60.The technology was supplied by M/S BABCOCK with rated capacity of125 T/Hr. These were Grate firing , Multiple fuel ( Coal, BF gas, Mixed Gas, Furnace oil) boilers. • HP Boiler # 1& 2 renovated in the year 1994-95 by M/S BHEL to AFBC boilers& Capacity rerated to 95 T/Hr.Coal Firing in HP Boiler # 3 & 4 was stopped. HP Boiler # 5 & 6 • Commissioned in the year 65-66. During the expansion of CPP-I. The technology was supplied by M/S BABCOCK with rated capacity of 125 T/Hr. These are pulverized fuel firing( 3 no’s of Ball Mills) with multiple fuel ( Coal, BF gas, Mixed Gas, Furnace oil) firing facility. • Steam Pressure and temperature of all the HP Boilers – 59 Kg/cm2, 485oC. MP Boiler # 1 & 2 • Commissioned on 1978. Technology supplier –IJT. Technology adopted – Stoker Fired. Fuel – Coal ( Size minus 25 mm). Capacity – 60 T/Hr. Steam Pressure and temperature – 18 Kg/cm2, 350oC. MP Boiler # 3. • Commissioned on 1998. Technology supplier –IJT. Technology adopted – CFBC ( Circulating Fluidized Bed Boiler).Fuel – Coal ( Size minus 6 mm). Capacity – 60 T/Hr. Steam Pressure and temperature – 18 Kg/cm2, 350oC.

  9. Turbo-Blowers BF # 4 BF # 1 D – Delivery M - Manifold M M D D M D M D M D M D 5 4 3 2 6 1

  10. Turbo-Blowers

  11. 100 TPH BLR # 1 MAIN STEAM BUS #! 1 FROM FEED LINE HEADER POWER AND BLOWING STATION (NEW) BLR # 2 FROM FEED LINE HEADER SCHEMATIC DIAGRAM OF BOILER AND MAIN STEAM HEADER BLR # 3 FROM FEED LINE HEADER MAIN STEAM BUS # 2 FROM WHRB MIN 20 TPH MAX 50 TPH

  12. POWER AND BLOWING STATION (NEW) SCHEMATIC OF MAIN STEAM BUS DISTRIBUTION SYSTEM STEAM TO T.B # 1 STEAM TO T.B # 2 MAIN STEAM HEADERS STEAM TO T.B # 3 STEAM TO STG # 1 STEAM TO STG # 2 STEAM TO 11 ATA PRDS STEAM TO 25 ATA PRDS

  13. POWER AND BLOWING STATION (NEW) DETAILS OF TURBO BLOWER : TURBINE

  14. POWER AND BLOWING STATION (NEW) BLOWER DETAILS :

  15. POWER AND BLOWING STATION (NEW) STG DETAILS :

  16. POWER AND BLOWING STATION (NEW) TRTG DETAILS :

  17. POWER AND BLOWING STATION (NEW) BPTG DETAILS :

  18. Challenges in O & M

  19. Challenges in O & M

  20. Challenges in O & M

  21. Challenges in O & M

  22. Thank You